Skip to main content

New Slovakia highway opening for traffic

Stretches of a major new highway project in Slovakia are opening for traffic. Two sections of the D1 highway are opening by the end of 2015. Slovakian National Motorway Company has said that the second section of the 9.5km D1 highway stretch from Janovce-Jablonov, near the town of Levoca, will open by the end of 2015. The other section set to open will be the D1 stretch from Fricovce – Svinia and located near Presov. During 2015 NDS planned to open five new motorway stretches, of which three are already in
November 26, 2015 Read time: 2 mins
Stretches of a major new highway project in Slovakia are opening for traffic. Two sections of the D1 highway are opening by the end of 2015. 7808 Slovakian National Motorway Company has said that the second section of the 9.5km D1 highway stretch from Janovce-Jablonov, near the town of Levoca, will open by the end of 2015. The other section set to open will be the D1 stretch from Fricovce – Svinia and located near Presov. During 2015 NDS planned to open five new motorway stretches, of which three are already in use. The Janovce -Jablonov section of the D1 highway is being built by a consortium headed by 3281 Eurovia and will cost €151.51 million, including VAT. This section was originally planned to be completed in July 2015. The 11.2km section from Fricovce - Svinia stretch is being built by 945 Strabag and 2877 Doprastav and will cost €137.51 million including VAT.

For more information on companies in this article

Related Content

  • Peru’s Matarani – Punta de Bonbon Highway
    January 5, 2016
    A major new highway project in Peru will improve connectivity for the Arequipa region - Mauro Nogarin writes Peru’s Matarani-Bonbon road project is an important route and forms part of the Camana - Dv Quilca - Ilo - Tacna highway project. The road stretches through several provinces in the Arequipa region. The deadline for completing the work is 720 days after January 2015, and it is scheduled to be completed by December 2016. Progress has been good and as of July 2015, it was 80% completed. The main
  • Pre-stressed bridge decks use modular formwork system
    July 9, 2012
    Imaginative formwork, often using modular components, is helping to shape some challenging bridges worldwide. Patrick Smith reports Traffic volumes in and around Prague have swollen massively in recent years, pushing the existing road network to the limits of its capacity. To permanently ease congestion in the Czech capital's centre, a multi-lane orbital motorway is under construction as a high capacity bypass for central Prague and to link up all the motorways and other major highways radiating from the ci
  • A new highway for northern Colombia
    July 17, 2023
    The Pamplona-Cúcuta highway is playing an important role for the development of northern Colombia
  • Brazil’s Serra do Cafezal Highway
    July 29, 2015
    Brazil's improved Mercosur route will boost capacity and cut travel time - Mauro Nogarin writes. The Régis Bittencourt Highway is one of the main access routes of the Mercosur traffic. It has a length of 400km and connects the main cities of São Paulo and Curitiba, which allows for products to enter from the southeast toward the rest of the southern part of Brazil and later transit to Argentina, Paraguay and Uruguay. Products also flow into Brazil from Mercosur through this major highway. The cost of the hi