Skip to main content

New Silvertown Tunnel under River Thames in London

Transport for London (TfL) has been granted a Development Consent Order (DCO) by the Department for Transport (DfT) for the Silvertown Tunnel. This new twin-bore road tunnel will run under the River Thames in East London. The DCO is the formal process giving the green light to any development categorised as a Nationally Significant Infrastructure Project (NSIP). The tunnel is set to open in 2023 and is intended to help reduce the chronic congestion at the existing Blackwall Tunnel. The project will also he
May 11, 2018 Read time: 3 mins
2387 Transport for London (TfL) has been granted a Development Consent Order (DCO) by the Department for Transport (DfT) for the Silvertown Tunnel. This new twin-bore road tunnel will run under the River Thames in East London. The DCO is the formal process giving the green light to any development categorised as a Nationally Significant Infrastructure Project (NSIP).


The tunnel is set to open in 2023 and is intended to help reduce the chronic congestion at the existing Blackwall Tunnel. The project will also help to improve the reliability of the road network in east London. It will enable significantly improved cross-river public transport connections, with up to 37 buses an hour using the tunnel. Further pedestrian and cycling improvements will also be made on both sides of the river.

Work will be carried out on the areas surrounding the entrances to the tunnel to improve conditions for local residents and create safe, attractive new walking and cycling routes around Royal Victoria and the Greenwich Peninsula.

With congestion and air quality around the Blackwall Tunnel predicted to get worse in as London’s population grows, the Silvertown Tunnel is crucial to providing a more reliable crossing. Drivers using the Blackwall Tunnel regularly get caught up in delays of 20 minutes or more during busy times, leading to around a million hours being wasted in queues every year and costing the economy an estimated £10 million. When incidents cause the tunnel to close temporarily, 5km tail-backs can occur in under six minutes.

The new Silvertown Tunnel will be privately financed through a Design, Build, Finance and Maintain contract, with the successful delivery partner receiving payments from TfL once the tunnel is open and available for use. These will be made in part via a user charge on both the new tunnel and the existing Blackwall Tunnel. The link will require the latest tolling technology.

As part of the six-month public inquiry into the tunnel, the Mayor and TfL outlined a number of improved plans for Silvertown Tunnel with a greener focus and more emphasis on encouraging people to use public transport. These include further pedestrian and cycling improvements on both sides of the river such as upgrades to Boord Street and Tunnel Avenue in the south and Silvertown Way and Tidal Basin Road in the north.

Now that the DCO has been granted, TfL is working with local boroughs, landowners and stakeholders to outline the next steps for the project. This includes agreeing details of land acquisitions, construction logistics plans and access requirements for residents, visitors and local businesses as the scheme progresses.

TfL will also be progressing procurement of a contractor to design and build the tunnel, with a look to confirm a preferred bidder in winter 2018 and award the contract in early 2019 so that construction can begin later next year. During construction, TfL is committed to ensuring that the majority of construction material is transported by river.

Two bidders (Cintra Global and Hochtief PPP Solutions) have been shortlisted to design and build the Tunnel. As part of the tender, all contractors will be required to deliver a range of measures to reduce construction impacts.

The delivery of the Silvertown Tunnel was included in the Mayor’s Transport Strategy and forms part of the Mayor’s wider plans for sustainable river crossings across the Thames. These include a new walking and cycling crossing between Rotherhithe and Canary Wharf as well as looking at the feasibility for a new DLR crossing between Gallions Reach and Thamesmead, along with options for further sustainable crossings in west London.

For more information on companies in this article

Related Content

  • Merseylink wins US$3.12bn Mersey Gateway Project contract
    June 20, 2013
    Merseylink was today announced as the preferred bidder for the US$3.12 billion (£2bn) Mersey Gateway Project in North West England. Making the announcement together in the observatory in the Catalyst Museum in Widnes overlooking the River Mersey, Halton Borough Council and Merseylink also confirmed they have jointly identified savings amounting to “tens of millions of pounds” on the projected public sector contribution to the project budget.
  • UK’s Mersey Gateway Project team invites final tenders
    February 26, 2013
    The team behind what is set to be one of the UK’s largest infrastructure initiatives in the next few years has invited final tenders from the three shortlisted bidders competing to deliver it. The Mersey Gateway Project bidders have been asked to submit their tenders on behalf of Halton Borough Council by 10 April 2013, and an announcement about the identity of the preferred bidder is due in June 2013. This will allow the team behind the North West England-based project to sign a contract and begin construc
  • Cowi wins Massey Tunnel design
    July 22, 2022
    Cowi has won a contract as owner's engineer for an eight-lane replacement immersed tunnel under the Fraser River near the Pacific coast city of Vancouver. Cowi said it will draw on its experience designing the original four-lane George Massey Tunnel in 1959 and whose removal the engineering firm will later oversee.
  • London police mapping crash data
    June 27, 2013
    London’s Metropolitan Police Service is using the latest desktop mapping software to collate essential data about road traffic collisions. The advanced Geographical Information System (GIS) from GGP Systems in being used to identify and map the exact location of incidents where a personal injury has occurred and prepare detailed reports for the Department for Transport (DfT) and Transport for London (TfL). This can be used to highlight problem areas, with plans for improving infrastructure then being drawn