Skip to main content

New SF-Oakland Bay Bridge over budget and overdue

The project to replace the San Francisco-Oakland Bay Bridge is taking too long and is going over budget, according to California state officials. The officials claim US$1.28 billion had been spent for the replacement of the damaged eastern span by 2004, with the cost continue going up. A projected $20 million repair was announced on 10 July 2013 after the failure of 32 steel rods in stress tests. The 3.54km structure has yet to be completed after nearly 10 years. Cost projection has increased to roughly $6.
July 22, 2013 Read time: 1 min
The project to replace the San Francisco-Oakland Bay Bridge is taking too long and is going over budget, according to California state officials. The officials claim US$1.28 billion had been spent for the replacement of the damaged eastern span by 2004, with the cost continue going up.

A projected $20 million repair was announced on 10 July 2013 after the failure of 32 steel rods in stress tests. The 3.54km structure has yet to be completed after nearly 10 years. Cost projection has increased to roughly $6.4 billion. The bridge had fallen in the Loma Prieta earthquake in 1989.

Related Content

  • Concern over condition of US bridges
    July 5, 2019
    A new report from the American Road & Transportation Builders Association (ARTBA), highlighting the poor condition of many US bridges, is nothing less than a national scandal. According to ARTBA’s report, 47,052 US bridges are in poor condition, while 18,842 Interstate highway bridges have identifiable repair needs. The length of America’s structurally deficient bridges if placed end-to-end would span nearly 1,760km, ARTBA’s examination of federal government data shows. The Brooklyn (NY), Arlington M
  • Philippine Biliran Bridge repairs start
    February 27, 2025
    The nearly US$500,000 project involves the replacement of corroded bolts and steel members and steel plates to the bridge that connects the islands of Biliran and Leyte.
  • Building a replacement bridge in record time
    March 13, 2023
    The construction of a new bridge in Pittsburgh, Pennsylvania to replace a collapsed structure has been carried out in record time
  • New Turkish bridge opens to traffic
    June 30, 2016
    Turkey’s new Osman Gazi Bridge has now opened for traffic. This bridge can carry 40,000 vehicles/day, while halving the travel time needed using previous routes. This is a six lane suspension bridge measuring 3km and spanning the Sea of Marmara. Construction has taken 42 months and the structure has been designed to cope with the risk of earthquakes. The project has been co-ordinated by Japanese construction company IHI, with Siemens handling the role of electro and mechanical contractor. Siemens has dev