Skip to main content

New Serbian bridge project being proposed

A new bridge project is being planned for Serbia. The structure will span the Zapadna Morava River. The expected cost of the work has not so far been disclosed. Building the bridge will however improve access for construction work on the Prejina to Pozega highway.
November 18, 2019 Read time: 1 min

 A new bridge project is being planned for Serbia. The structure will span the Zapadna Morava River. The expected cost of the work has not so far been disclosed. Building the bridge will however improve access for construction work on the Prejina to Pozega highway.

Related Content

  • Bentley’s Be Inspired Awards highlight innovation in software use
    January 6, 2015
    Innovation, from design to on-site execution, is alive and well, thanks to a good helping of software application. David Arminas reports from software developer Bentley’s annual global conference, held this year in London Successful project delivery is increasingly about hard men and women using software to get the job done and this year’s global conference in London by US-based software developer Bentley highlighted some innovative - and startling - examples. As usual, the Year in Infrastructure 2014
  • Balfour wins US-70 upgrade in North Carolina
    February 14, 2023
    Balfour is already involved in the US-70 Havelock Bypass and US-70 James City projects.
  • New third Don River bridge project planned for Aberdeen
    August 27, 2014
    A new bridge is planned for the Scottish city of Aberdeen, centre of the country’s oil industry. Continued growth in the city from the oil industry is fuelling an increase in vehicle numbers, with congestion a serious problem. As a result, Aberdeen City Council has given a contract to Balfour Beatty to construct the Third Don Crossing at a cost of some €17.6 million (£14.3 million). The two existing crossings to the north of the city centre suffer heavy congestion at peak periods at present and this new bri
  • Canada bridge deal
    April 26, 2012
    Technical investigations have highlighted structural issues with a bridge on a key bridge link on a highway in Quebec, Canada. The bridge on the 20 East highway close to the Pierre-Laporte exit in Lévis requires repair work. The bridge was built in 1965 and will be completely rebuilt so that a third lane can be added to the 20 East highway as far as the Président-Kennedy exit in Lévis. A contract has been awarded to Cima+-Dessau for the work, which is expected to commence in 2013.