Skip to main content

New Russian tunnel for Rostov-on-Don

In Russia the new Severny tunnel is planned for Rostov-on-Don. This four-lane tunnel will be 3.5 km long, and will be designed to carry up to 60,000 vehicles/day. The project is expected to cost in the region of US$188.43-226.12 million to construct. Design work will take two years, with the project due for completion in four years. The tunnel's service life is expected to total 24 years.
December 10, 2014 Read time: 1 min
In Russia the new Severny tunnel is planned for Rostov-on-Don. This four-lane tunnel will be 3.5 km long, and will be designed to carry up to 60,000 vehicles/day. The project is expected to cost in the region of US$188.43-226.12 million to construct. Design work will take two years, with the project due for completion in four years. The tunnel's service life is expected to total 24 years.

Related Content

  • Successful resurfacing at New York's JFK Airport
    February 8, 2012
    A huge logistics operation has been carried out successfully at New York's JFK Airport. One of the busiest runways at one of the world's busiest airports is now open to air traffic again, following a 120 day closure for resurfacing.
  • Successful resurfacing at New York's JFK Airport
    May 3, 2012
    A huge logistics operation has been carried out successfully at New York's JFK Airport. One of the busiest runways at one of the world's busiest airports is now open to air traffic again, following a 120 day closure for resurfacing.
  • Austria's new tunnel meets safety regulations
    July 13, 2012
    New safety regulations and high traffic volumes require new tunnel construction all across Europe. Mike Woof reports Anew highway tunnel now being built in Austria will boost traffic volumes and safety standards on a key European route. The existing Pfänder Tunnel lies close to Austria's borders with Germany and Switzerland and carries a heavy traffic volume, so a new parallel tunnel is under construction to help spread this load, increasing capacity as well as safety. Stringent tunnel safety standards have
  • Innovative road/drainage tunnel plan for Jakarta
    February 16, 2015
    An innovative combined road and drainage tunnel is being proposed for Indonesia’s capital Jakarta. A study is underway at the moment for this novel integrated tunnel project, which is expected to cost in the region of US$1.88 billion. Work is due to commence during 2015, with the initial phase of the construction being carried out by Antaredja Mulia Jaya. The project is calling for two 12km tunnels that will help alleviate flooding in the city during periods of high rainfall as well as featuring a road. The