Skip to main content

New Russian bridge project to span Samara River

Construction work is due to start shortly on the new Frunzensky Bridge in Russia, which will span the Samara River. The project is expected to take 35 months to carry out with the start date having been announced as December 2014. The work will also include building a new junction to connect the approach to the bridge with an existing highway. The project cost has been budgeted at just over US$264 million.
October 21, 2014 Read time: 1 min
Construction work is due to start shortly on the new Frunzensky Bridge in Russia, which will span the Samara River. The project is expected to take 35 months to carry out with the start date having been announced as December 2014. The work will also include building a new junction to connect the approach to the bridge with an existing highway. The project cost has been budgeted at just over US$264 million.

Related Content

  • New Guatamala City bridge package awarded
    October 14, 2022
    A new Guatamala City bridge package has been awarded.
  • England’s A14 project River Great Ouse Viaduct completed
    February 28, 2019
    Construction of the biggest bridge in Highways England’s €1.73 billion A14 Cambridge-to-Huntingdon upgrade has been completed. The River Great Ouse Viaduct stretches for 0.8km and when opened to traffic next year will take the new A14 road over the floodplain and the East Coast Mainline Railway line. Work began in November 2016 on the bridge that is part of a new 27.4km bypass under construction to the south of Huntingdon and away from the existing A14. The road is being widened to three lanes in both
  • Brazil-Paraguay bridge project underway
    August 12, 2019
    A new bridge connecting Presidente Franco in Paraguay with Foz do Iguaçu in Brazil is now being built. The bridge will be the second spanning the Parana River in the area and is costing US$84.35 million to construct. The present Puente Internacional de la Amistad connection joins Paraguay’s Route 7 with Brazil’s Route 277 but is no longer able to cope with demand. The new bridge will carry all the heavy truck traffic passing this important international border when it opens, with the existing structure bein
  • A major highway deal has been awarded by the Bosnian authorities
    May 25, 2012
    Construction work is now going ahead on the Suhodol-Tarcin section of Bosnia’s Corridor Vc highway. The Bosnian Government and highway company Autoceste FBiH Mostar signed a contract with Turkish company Cengiz Insaat Sanayi ve Ticaret for this section of the Corridor Vc highway. The deal is worth €115.2 million and will be for construction of a total of 5km of the motorway. The work is expected to take 28 months to complete. However a consortium of five construction companies from Bosnia and Herzegovina is