Skip to main content

New Russian bridge project to span Samara River

Construction work is due to start shortly on the new Frunzensky Bridge in Russia, which will span the Samara River. The project is expected to take 35 months to carry out with the start date having been announced as December 2014. The work will also include building a new junction to connect the approach to the bridge with an existing highway. The project cost has been budgeted at just over US$264 million.
October 21, 2014 Read time: 1 min
Construction work is due to start shortly on the new Frunzensky Bridge in Russia, which will span the Samara River. The project is expected to take 35 months to carry out with the start date having been announced as December 2014. The work will also include building a new junction to connect the approach to the bridge with an existing highway. The project cost has been budgeted at just over US$264 million.

Related Content

  • Bridge link underway in Texas
    March 22, 2012
    In the US state of Texas, work is in hand to build new bridges carrying US-281 over the Colorado River at Marble Falls. The Texas Department of Transportation has set a budget of close to US$30 million to replace the existing Lake Marble Falls Bridge with two new bridges.
  • Russia's key highway development project
    February 8, 2012
    One of the largest construction programmes in Europe is being carried out to get a Russian resort ready for the Winter Olympics. Patrick Smith reports
  • Russia's key highway development project
    May 28, 2012
    One of the largest construction programmes in Europe is being carried out to get a Russian resort ready for the Winter Olympics. Patrick Smith reports. Daytime temperatures top 30°C in September, and with hundreds of shops and hotels, it is not difficult to see why Sochi has become Russia's premier holiday playground. The city, on the east coast of the Black Sea, near the border with Georgia, bustles with tourists, and this is boosted with delegates at the 9th International Investment Forum Sochi 2010.
  • Bridge spanning Nepal’s Bagmati River open to traffic
    April 3, 2014
    The bridge linking Old Baneshwor and Sinamangal over the Bagmati River in Nepal’s capital Kathmandu has now been officially opened. This was carried out by the former minister for Physical Planning and Transport although the bridge itself had been open to traffic for five months prior to the inauguration. The old bridge had to be closed after one of the piers subsided in September 2009, a common problem for bridges in Nepal. The Nepalese Government has initiated the new bridge in January 2010. There have be