Skip to main content

New Russian bridge project to span Samara River

Construction work is due to start shortly on the new Frunzensky Bridge in Russia, which will span the Samara River. The project is expected to take 35 months to carry out with the start date having been announced as December 2014. The work will also include building a new junction to connect the approach to the bridge with an existing highway. The project cost has been budgeted at just over US$264 million.
October 21, 2014 Read time: 1 min
Construction work is due to start shortly on the new Frunzensky Bridge in Russia, which will span the Samara River. The project is expected to take 35 months to carry out with the start date having been announced as December 2014. The work will also include building a new junction to connect the approach to the bridge with an existing highway. The project cost has been budgeted at just over US$264 million.

Related Content

  • A new tolled highway brings change for Austin, Texas
    February 10, 2020
    A new highway section in Austin, Texas marks a major departure for the southern US city
  • Chinese firm wins highways expansion project to decongest Nairobi
    January 5, 2017
    A Chinese contractor is carrying out a major road project intended to cut congestion in Kenyan capital Nairobi – Shem Oirere writes Chinese contractor China Wu Yi has won a US$163 million contract for the reconstruction and expansion of a 25km highway leading out of Kenya’s capital Nairobi with financing from the World Bank. The contract was awarded by the country’s National Highways Authority (KeNHA), a state-owned road agency responsible for the management, development, rehabilitation and maintenance of i
  • Bridge engineering worldwide
    July 1, 2013
    Guy Woodford looks at vital bridge construction, repair and inspection projects in China, Europe, North America and Australia The Heron Road Bridge in Ottawa, Ontario in Canada is a vital link within the City’s transport network, as it crosses the Rideau River, which divides the east and west parts of the City. Constructed in 1966-1967, the Heron Road Bridge is approximately 275m long and includes six lanes.
  • Kazakhstan bridge project complete
    December 16, 2016
    The opening of a new bridge in Kazakhstan that spans the Irtysh River is now offering a shorter route for drivers. The link is 12.3km long and is now the longest such structure in Central Asia, while the project cost around US$157 million. Its length was necessary as the bridge crosses a floodplain area, with a channel that can widen considerably following periods of heavy rain. Located in the country’s Pavlodar region, the bridge cuts the route used previously by over 40km. The bridge is expected to carry