Skip to main content

New Russian bridge project planned

A new bridge is planned for Russia, which will span the Sheksna River in Cherepovets. The bridge will measure 1.13km in length and the project also involves building 7km of connecting roads. The bridge will be built in Russia’s Vologda Region and the work has a pricetag of nearly US$248 million. Because of the river traffic, the bridge will have to be built high enough to allow a clear passage for vessels underneath. Construction work will commence during 2019 and is expected to take until to 2025 to comple
March 29, 2019 Read time: 1 min

A new bridge is planned for Russia, which will span the Sheksna River in Cherepovets. The bridge will measure 1.13km in length and the project also involves building 7km of connecting roads. The bridge will be built in Russia’s Vologda Region and the work has a pricetag of nearly US$248 million. Because of the river traffic, the bridge will have to be built high enough to allow a clear passage for vessels underneath. Construction work will commence during 2019 and is expected to take until to 2025 to complete.

Related Content

  • Kronprinsesse Marys Bro bridges Roskilde Fjord
    January 10, 2019
    A BESIX joint venture is giving the royal treatment to the new Kronprinsesse Marys Bro across Roskilde Fjord, writes David Arminas It was announced in September 2016 that Belgian group BESIX, in a joint venture (RBAI) with Italian firm Rizzani de Eccher and Spanish company Acciona Infraestructuras, had been chosen for the €133 million project. The award, by client Vejdirektoratet (Danish Road Directorate), marked the entry of BESIX into the Scandinavian market. Vejdirektoratet praised the winning bid as
  • India Bogibeel Bridge project
    December 14, 2016
    Construction work is underway on India’s Bogibeel Bridge, which will span the Brahmaputra River. When complete the bridge is expected to come with a price tag of US$746.8 million. The new bridge will provide both road and rail links over the Brahmaputra River and is expected to open to traffic in March 2018. The novel design features an upper deck with three traffic lanes for road vehicles as well as a lower deck carrying twin rail lines. Measuring 4.9km long, the bridge will be the longest in India carryin
  • US$242 million for Cape Fear bridge replacement
    July 26, 2024
    US$242 million is being secured for the Cape Fear bridge replacement.
  • New Tanzanian bridge project moving ahead
    August 2, 2019
    Tanzania’s planned Kigongo-Busisi Bridge will span part of Lake Victoria and improve transport connections for the country’s Mwanza Region.