Skip to main content

New route for UAE highway project

Work on a new road project worth US$102.6 million is now underway. In all the highway will be 140km long, connecting Al Faya, Razeen and Al Quaa. The work is being carried out by contractor Musanada. The project is being carried out in two stages, with the 88km stretch from Al Faya to Razeen and a 52km stretch from Razeen to Al Quaa.
October 19, 2016 Read time: 1 min
Work on a new road project worth US$102.6 million is now underway. In all the highway will be 140km long, connecting Al Faya, Razeen and Al Quaa. The work is being carried out by contractor Musanada. The project is being carried out in two stages, with the 88km stretch from Al Faya to Razeen and a 52km stretch from Razeen to Al Quaa.

Related Content

  • Funding for new Egyptian road tunnel project
    November 1, 2019
    Funding is being secured for a new Egyptian road tunnel project. improvements will be carried out along a 350km stretch of road connecting to the resort. New drainag
  • Vietnam’s new beltway project
    October 12, 2018
    Work is progressing in Vietnam’s Ho Chi Minh City for construction of the new Beltway No3. An additional US$128.6 million is being set aside from the city’s budget to speed up work on the highway. The new beltway will measure 90km long, will allow vehicle speeds of up to 100km/h, with from two to four lanes in either direction. The route is being built in four sections. One stretch connects the Trung Luong expressway and National Highway No 22, another links National Highway No 22 and Binh Chuan, one joins
  • Designer for Texas highway expansion
    September 27, 2023
    The designer has been selected for a Texas highway expansion.
  • Innovative road/drainage tunnel plan for Jakarta
    February 16, 2015
    An innovative combined road and drainage tunnel is being proposed for Indonesia’s capital Jakarta. A study is underway at the moment for this novel integrated tunnel project, which is expected to cost in the region of US$1.88 billion. Work is due to commence during 2015, with the initial phase of the construction being carried out by Antaredja Mulia Jaya. The project is calling for two 12km tunnels that will help alleviate flooding in the city during periods of high rainfall as well as featuring a road. The