Skip to main content

New roads to connect Slovakia and Czech Republic

New road links are planned to connect Slovakia and its neighbour, the Czech Republic. The Slovak Ministry of Transport stated that by 2020 two new routes are planned to link the countries. The R6 expressway will run from Puchov in Slovakia and connect the Trencin region with Zlin in the Czech Republic. Meanwhile the R5 expressway will run from Svrcinovec in Slovakia and link the country’s Zilina regions with the Morava-Sliezsko region in the Czech Republic. Construction for the R6 project is expected to sta
February 26, 2014 Read time: 2 mins
New road links are planned to connect Slovakia and its neighbour, the Czech Republic. The Slovak Ministry of Transport stated that by 2020 two new routes are planned to link the countries. The R6 expressway will run from Puchov in Slovakia and connect the Trencin region with Zlin in the Czech Republic. Meanwhile the R5 expressway will run from Svrcinovec in Slovakia and link the country’s Zilina regions with the Morava-Sliezsko region in the Czech Republic. Construction for the R6 project is expected to start in 2017, while the construction of the R5 stretch from Svrcinovec to the Slovak-Czech border should be carried out between 2015 and 2016. The 10.8km R6 section from Puchov - Mestecko should be built between 2016 and 2020, while the 12.2km section of the R6 from Mestecko to the Slovak-Czech border is planned to be built in 2017 - 2020. The construction of the Czech stretch should start on the turn of 2016/2017.

Related Content

  • Slovakia’s new highway tenders opening
    November 15, 2024
    Slovakia is opening new highway tenders to bidders.
  • Egypt’s road programme is now restarting
    February 20, 2014
    Egypt is developing its road network – local reporting and images by Egypt correspondent Mohammed Elsayed Tantawy. Egypt is now gearing up its road construction activity, with a view to reducing congestion and improving traffic flow. The country’s main highway connecting capital Cairo with the port city of Alexandria has already seen a major widening programme, but other important routes are also now being upgraded and improved. The road development programme started in earnest some years ago but was delaye
  • Construction of Slovakia’s D3 stretch to start by end of 2016
    November 28, 2016
    Construction of the 5.6km stretch of the D3 motorway Cadca, Bukov - Svrcinovec in Slovakia could start by the end of the year. The tender was rolled out in May 2015 by the Slovak national motorway operator NDS and the final contract was recently signed for the €239million deal. Winners are the consortium of Hochtief from Germany and Austrian firms Strabag and PORR. Completion is schedule for 2020. Porr’s share of the contract is reportedly around €81 million and Strabag's around €105 million. Work inc
  • Delays plague Slovakia’s D1 motorway work
    May 12, 2017
    Slovakia is reporting delays to works on the D1 motor, the country’s major east-west corridor and part of several pan-European routes, including the E50. The planned 2020 completion of the D1 motorway linking Bratislava - Kosice could be 2021. There are reported technical complications to the section between Lietavska Lucka - Dubna Skala stretch with the Visnove tunnel near Zilina is experiencing complications. Work by the consortium of OHL and Vahostav on the D1 stretch Hubova – Ivachvova is suspended due