Skip to main content

New roads to connect Slovakia and Czech Republic

New road links are planned to connect Slovakia and its neighbour, the Czech Republic. The Slovak Ministry of Transport stated that by 2020 two new routes are planned to link the countries. The R6 expressway will run from Puchov in Slovakia and connect the Trencin region with Zlin in the Czech Republic. Meanwhile the R5 expressway will run from Svrcinovec in Slovakia and link the country’s Zilina regions with the Morava-Sliezsko region in the Czech Republic. Construction for the R6 project is expected to sta
February 26, 2014 Read time: 2 mins
New road links are planned to connect Slovakia and its neighbour, the Czech Republic. The Slovak Ministry of Transport stated that by 2020 two new routes are planned to link the countries. The R6 expressway will run from Puchov in Slovakia and connect the Trencin region with Zlin in the Czech Republic. Meanwhile the R5 expressway will run from Svrcinovec in Slovakia and link the country’s Zilina regions with the Morava-Sliezsko region in the Czech Republic. Construction for the R6 project is expected to start in 2017, while the construction of the R5 stretch from Svrcinovec to the Slovak-Czech border should be carried out between 2015 and 2016. The 10.8km R6 section from Puchov - Mestecko should be built between 2016 and 2020, while the 12.2km section of the R6 from Mestecko to the Slovak-Czech border is planned to be built in 2017 - 2020. The construction of the Czech stretch should start on the turn of 2016/2017.

Related Content

  • Plans in hand for Slovakia’s longest tunnel
    June 16, 2014
    In Slovakia plans are being made for a new project that will become the country’s longest tunnel when it is complete. Salini Impregilo is the contractor heading the project. The work looks set to cost in the order of €410 million and the project is due for completion in late 2019 or early 2020. Although there was a lower priced bid for the project, this was excluded due to technical problems relating to the proposed tunnel exits. The Visnove Tunnel will measure some 7.7km long and will be constructed in the
  • Czech route dispute
    March 1, 2012
    In the Czech Republic there is disagreement over the routes for the R43 and R52 expressways, which are being upgraded.
  • Czech route dispute
    April 12, 2012
    In the Czech Republic there is disagreement over the routes for the R43 and R52 expressways, which are being upgraded.
  • Moscow-Kazan highway plans
    June 17, 2020
    The Moscow-Kazan highway plans form part of the nation’s future economic recovery.