Skip to main content

New road project for Sydney

Road widening work is being planned for Sydney, New South Wales in Australia. The project encompasses widening a 3km stretch of Prospect Highway to four lanes and a 2.2km section of Memorial Avenue to four lanes also. Both sections features just two lanes at present and the work is expected to cost US$211.6 million (A$300 million). The tendering process is due to commence shortly, with construction planned to start in late 2019. The work will include building new bridges over the M4 Highway and Great Wester
January 14, 2019 Read time: 1 min

Road widening work is being planned for Sydney, New South Wales in Australia. The project encompasses widening a 3km stretch of Prospect Highway to four lanes and a 2.2km section of Memorial Avenue to four lanes also. Both sections features just two lanes at present and the work is expected to cost US$211.6 million (A$300 million). The tendering process is due to commence shortly, with construction planned to start in late 2019. The work will include building new bridges over the M4 Highway and Great Western Highway to carry the extra traffic lanes. It will also include upgrades to the on and off ramps to the M4 Highway and Great Western Highway, as well as provision for pedestrians and cyclists.

Related Content

  • Framework solutions speed bridge construction
    February 24, 2012
    Framework plays a key role in construction of bridges and other major infrastructure works – Mike Woof writes Speeding construction processes can help reduce costs considerably and the latest formwork solutions can provide significant benefits in this regard. In many projects the use of standardized and modular formwork solutions can play a key role, reducing the planning and systems required for bridge building work.
  • Vietnam’s major road works are underway
    January 10, 2023
    Vietnam’s major road works are underway as North-South Expressway stages commence.
  • Doosan machines for B2 highway project in Germany
    January 30, 2014
    Thannhauser + Ulbricht Straßen- und Tiefbau of Fremdingen in Southern Germany, is currently upgrading the country's B 2 federal highway near the town of Roth and employing four new Doosan DA30 articulated dump trucks (ADTs) and a new Doosan DX490LC-3 crawler excavator for the earthmoving work. The machines belong to the rental fleet of Rühle Maschinenpark, based in Untermünkheim-Haagen, South West Germany. The B 2 is one of Germany's oldest highways and runs the entire length of the country for a distance
  • New road project underway in Austin, Texas
    April 27, 2023
    Construction work is now underway on a new road project in Austin, Texas.