Skip to main content

New road now open to traffic in Rwanda

A major road project in Rwanda has been completed on schedule by contractor STRABAG. The rebuilt road’s route runs 78km and connects capital Kigali with the border town of Gatuna. STRABAG won the contract to reconstruct the road in July 2011. The construction phase commences in January 2012 and took 44 months to complete. The official opening took place in the presence of Rwanda’s Minister of Infrastructure James Musoni and Neven Mimica, the European Union Commissioner for International Cooperation and Deve
September 24, 2015 Read time: 2 mins
A major road project in Rwanda has been completed on schedule by contractor 945 STRABAG. The rebuilt road’s route runs 78km and connects capital Kigali with the border town of Gatuna. STRABAG won the contract to reconstruct the road in July 2011. The construction phase commences in January 2012 and took 44 months to complete. The official opening took place in the presence of Rwanda’s Minister of Infrastructure James Musoni and Neven Mimica, the European Union Commissioner for International Cooperation and Development.

The route is of prime importance in the region as it links Rwanda to Kampala, the capital of Uganda. From Uganda the route also connects through Kenya to its port of Mombasa, a section of road also undergoing upgrading at present. Half of the imports to Rwanda and eastern Congo pass through the Northern Corridor, along the Kigali–Gatuna road. The completion marks a significant achievement of the regional integration process and cross-border trade and will help boost economic development in the region by connecting Rwanda to the rest of the region.

For more information on companies in this article

Related Content

  • Serbia reduces cost of highway construction
    March 22, 2012
    Serbia has managed to reduce the cost of building the Corridor 10 highway by €80 million. These funds will instead be used to pay for upgrades and improvements needed for the second section of the highway project, close to Neradovci. So far some 180km of the Corridor 10 highway has been built over a 40 month time frame. A further 150km of the highway has still to be built. Work on the Corridor 10 motorway is also being financed by the European Bank for Reconstruction and Development and the state budget.
  • Support for Poland’s A1
    July 6, 2012
    The European Investment Bank (EIB) has in total granted a long-term facility of €1.070 billion for the construction of the second phase of the A1 motorway forming part of the priority trans-European transport network connecting the north of Poland (Gdansk) with the Austrian capital Vienna, via the Czech and Slovak Republics. The loan will finance the construction of a 62km section of the A1 motorway between Nowe Marzy and Torun on the basis of a design, build, finance and operate (DBFO) concession. This con
  • Serbia starts in-depth talks with the Chinese for Corridor 11 work
    May 7, 2015
    Serbia has entered into “in depth” negotiations with two Chinese companies for concession contracts along the Corridor 11 motorway between Belgrade and the Montenegrin border. Shandong High Speed Group and the China Road and Bridge Corporation (CRBC) are the two Chinese companies that have passed the pre-qualification process. The project value has not been mentioned. Serbian vice president Zorana Mihajlovic said that the Chinese have requested guarantees for transport and Serbia is considering this a
  • Saudi re-opens Jadeedah Arar crossing
    December 4, 2020
    After a 50km upgrade, the Saudi road into Iraq officially re-opens.