Skip to main content

New road now open to traffic in Rwanda

A major road project in Rwanda has been completed on schedule by contractor STRABAG. The rebuilt road’s route runs 78km and connects capital Kigali with the border town of Gatuna. STRABAG won the contract to reconstruct the road in July 2011. The construction phase commences in January 2012 and took 44 months to complete. The official opening took place in the presence of Rwanda’s Minister of Infrastructure James Musoni and Neven Mimica, the European Union Commissioner for International Cooperation and Deve
September 24, 2015 Read time: 2 mins
A major road project in Rwanda has been completed on schedule by contractor 945 STRABAG. The rebuilt road’s route runs 78km and connects capital Kigali with the border town of Gatuna. STRABAG won the contract to reconstruct the road in July 2011. The construction phase commences in January 2012 and took 44 months to complete. The official opening took place in the presence of Rwanda’s Minister of Infrastructure James Musoni and Neven Mimica, the European Union Commissioner for International Cooperation and Development.

The route is of prime importance in the region as it links Rwanda to Kampala, the capital of Uganda. From Uganda the route also connects through Kenya to its port of Mombasa, a section of road also undergoing upgrading at present. Half of the imports to Rwanda and eastern Congo pass through the Northern Corridor, along the Kigali–Gatuna road. The completion marks a significant achievement of the regional integration process and cross-border trade and will help boost economic development in the region by connecting Rwanda to the rest of the region.

For more information on companies in this article

Related Content

  • Despite earlier contractor issues, road projects in Bosnia are proceeding on track
    May 16, 2012
    Key road construction projects are now moving forward in Bosnia with work on-track for the Sarajevo ringroad as well as the Corridor Vc highway. Construction of a 130km section of the Corridor Vc highway should be complete by 2014 according to Bosnia's Ministry of Transport and Telecoms. Work on the first section of the Sarajevo ringroad should be completed within five months, following the signing of an agreement worth €17 million between the Austrian firm Strabag and the Bosnian company HP Investing. The
  • Serbia highway 50% complete
    January 14, 2025
    A key Serbian highway is 50% complete.
  • The Nepalese Government is investing in roads around capital Kathmandu
    May 16, 2012
    A new road-widening strategy is being put into effect in Nepal’s Kathmandu Valley. The aim of this programme is to reduce traffic jams on busy roads, especially during peak hours. A major problem for Kathmandu is that the current road the infrastructure in the city is not sufficient for the increasing numbers of vehicles. In a bid to tackle the problem, the authorities have initiated a programme of road widening in various areas of Kathmandu Valley. However, obstructions have been encountered due to residen
  • CRCP is first choice for Belgian highway
    November 28, 2012
    Dan Gilkes reports on a Belgian highway upgrade When the Ministry of Public Works in the Belgian State of Flanders decided to reconstruct and resurface 19km of the N49 Antwerp-Knokke Expressway, continuously reinforced concrete paving (CRCP) with an exposed aggregate surface was the natural material choice. Indeed exposed aggregate, with its high grip and low noise benefits, has been the first option for all motorway surfacing work in Belgium since the 1980s. However, the €15.65 million contract is not a li