Skip to main content

New road now open to traffic in Rwanda

A major road project in Rwanda has been completed on schedule by contractor STRABAG. The rebuilt road’s route runs 78km and connects capital Kigali with the border town of Gatuna. STRABAG won the contract to reconstruct the road in July 2011. The construction phase commences in January 2012 and took 44 months to complete. The official opening took place in the presence of Rwanda’s Minister of Infrastructure James Musoni and Neven Mimica, the European Union Commissioner for International Cooperation and Deve
September 24, 2015 Read time: 2 mins
A major road project in Rwanda has been completed on schedule by contractor 945 STRABAG. The rebuilt road’s route runs 78km and connects capital Kigali with the border town of Gatuna. STRABAG won the contract to reconstruct the road in July 2011. The construction phase commences in January 2012 and took 44 months to complete. The official opening took place in the presence of Rwanda’s Minister of Infrastructure James Musoni and Neven Mimica, the European Union Commissioner for International Cooperation and Development.

The route is of prime importance in the region as it links Rwanda to Kampala, the capital of Uganda. From Uganda the route also connects through Kenya to its port of Mombasa, a section of road also undergoing upgrading at present. Half of the imports to Rwanda and eastern Congo pass through the Northern Corridor, along the Kigali–Gatuna road. The completion marks a significant achievement of the regional integration process and cross-border trade and will help boost economic development in the region by connecting Rwanda to the rest of the region.

For more information on companies in this article

Related Content

  • VIDEO: Kolin-Kalyon and Limak-Cengiz win North Marmara connector tenders
    May 23, 2016
    Turkey has awarded the much-delayed tenders for the motorway connector roads to Istanbul’s Third Bosphorus Bridge.

    The 90km motorway section between Kinali and Odayeri was awarded to the Kolin-Kalyon joint-venture with completion in seven years and nine months, according to Turkish media reports. The 170km section between Kurtkoy and Akyazi was awarded to Limak-Cengiz joint-venture which will finish the work in six years and nine months.
  • Road and tunnel project eases Stockholm congestion
    February 23, 2012
    Part of the E20 European highway, the Norra länken aims to make a valuable contribution to easing congestion in central Stockholm. The construction of Norra länken is one of the biggest and most important road and tunnel projects being undertaken in Sweden, certainly in terms of scope and budget. It will be a link in the peripheral route around the Stockholm inner city area and be part of the E20 European Highway.
  • STRABAG wins Hungarian expressway contract
    December 20, 2017
    STRABAG has won the tendering process for a €125 million expressway construction contract in Hungary. The package of works is for the construction of the R76 expressway in western Hungary. The contract will involve building an 8.6km section of expressway along with a number of overbridges and will take 36 months to complete. The work is being carried out for the state-owned firm NIF Zrt. This will be the first section of the R76 expressway, running from Zalaegerszeg to the M7 motorway and the work will incl
  • Pūhoi-to-Warkworth motorway project
    September 25, 2020
    After a hiatus because of the COVID-19 lockdown, work has restarted on what will be one of New Zealand’s most visually impressive motorways. Andrew Thackwray, senior manager for project delivery for Waka Kotahi, the New Zealand Transport Agency, explains