Skip to main content

New Polish expressway project planned

Work is commencing on the S3 expressway project in Poland. Costing €355 million, the expressway will connect Bolko with Kamienna Gora Polnoc. A consrtium headed by Porr will handle the work, which is due for completion in the second half of 2023. The project will be complex as it will included two building tunnels as well as 12 bridges and flyovers.
November 11, 2019 Read time: 1 min

Work is commencing on the S3 expressway project in Poland. Costing €355 million, the expressway will connect Bolko with Kamienna Gora Polnoc. A consrtium headed by Porr will handle the work, which is due for completion in the second half of 2023. The project will be complex as it will included two building tunnels as well as 12 bridges and flyovers.

Related Content

  • New US$534 million tollway for Illinois
    December 2, 2024
    A new US$534 million tollway for Illinois will link to O’Hare International Airport.
  • Stecol ousted from Polish contract in favor of Intercor
    September 7, 2018
    Chinese contractor Stecol has been deselected as winner of a €204 million deal to build a Polish highway in favour of Polish firm Intercor. Poland’s National Chamber of Appeal announced its decision concerning construction of a road from Rdzawka to Nowy Targ, according to the Polish financial newspaper Puls Biznesu. Work on the project is due to start in 2020 with completion in 2023. Stecol was founded in 1962 as Sinohydro Tianjin Engineering Transportation works to build mostly hydro dams. It now works
  • Stecol ousted from Polish contract in favor of Intercor
    September 7, 2018
    Chinese contractor Stecol has been deselected as winner of a €204 million deal to build a Polish highway in favour of Polish firm Intercor. Poland’s National Chamber of Appeal announced its decision concerning construction of a road from Rdzawka to Nowy Targ, according to the Polish financial newspaper Puls Biznesu. Work on the project is due to start in 2020 with completion in 2023. Stecol was founded in 1962 as Sinohydro Tianjin Engineering Transportation works to build mostly hydro dams. It now works
  • New expressway for Shenzhen city in China
    September 8, 2014
    Work is now being carried out on a new expressway around the Chinese city of Shenzhen. This new route will form part of the Pearl River Delta expressway network and will also connect with 12 other national highways and expressways. The 76km expressway is due to open to traffic in 2018. The project is complex as it will include 12 tunnels and 82 bridges, with the overall cost estimated at US$4.35 billion.