Skip to main content

New Polish expressway project planned

Work is commencing on the S3 expressway project in Poland. Costing €355 million, the expressway will connect Bolko with Kamienna Gora Polnoc. A consrtium headed by Porr will handle the work, which is due for completion in the second half of 2023. The project will be complex as it will included two building tunnels as well as 12 bridges and flyovers.
November 11, 2019 Read time: 1 min

Work is commencing on the S3 expressway project in Poland. Costing €355 million, the expressway will connect Bolko with Kamienna Gora Polnoc. A consrtium headed by Porr will handle the work, which is due for completion in the second half of 2023. The project will be complex as it will included two building tunnels as well as 12 bridges and flyovers.

Related Content

  • Polish road project tender opening
    August 20, 2014
    In Poland the tendering process is underway for a new dual carriageway project. The project is for another stretch of the S3 dual carriageway, which will link the cities of Legnica with Bolkow. The 36km dual carriageway project will be divided into two sections and the work also includes the construction of service areas. The tenders have to be received by 19th September 2014. The dual carriageway will be of importance to Poland’s industrial output as Legnica is home to some of the country’s larger mining o
  • Highway proposals to extend Vietnam’s network
    November 12, 2015
    A series of major highway and road projects have been proposed for Vietnam. Investors have submitted a proposal to build North-South road costing an estimated US$383.8 million. Another proposal has come from the Project Management Board 85 to develop Bien Hoa-Tan Thanh-Cai Mep Seaport expressway, with an estimated cost of $591.5 million.
  • Strabag wins Polish road contracts worth €170 million
    November 2, 2017
    European-based construction group Strabag, through its Polish subsidiaries, has won three road contracts from Poland’s General Directorate for National Roads and Motorways (GDDKiA). The total contract value is split among two lots along the S19 north of Warsaw for €73 million and €43 million as well as one lot along the S61 in southern Poland for €54 million. “Poland is our third most important market [and] we celebrated our 30th anniversary there,” said Thomas Birtel, chief executive of Strabag Group.
  • India’s key bridge project
    December 21, 2018
    Plans are now being drawn up in India for the new Ganga River bridge crossing project. Costing US$395.3 million, the project has now been given the necessary approval by India’s prime minister. Construction is expected to take 40 months once work is underway, with completion due in 2023. The main bridge will measure 5,634m however the work includes building a 1,580m viaduct, 13 interchanges, four smaller bridges and a 110m flyover. It also includes four vehicular underpasses and a rail over bridge.