Skip to main content

New Panama Canal bridge crossing

Work is now complete the Panama Canal third bridge project. Costing US$590 million, the bridge features two lanes in either direction. Called the Atlantico Bridge, construction started on the link in early 2013. The new link will help reduce journey times for commuters as well as helping Panama’s tourist trade.
August 7, 2019 Read time: 1 min

Work is now complete for the Panama Canal third bridge project. Costing US$590 million, the bridge features two lanes in either direction and has a 530m central span. These dimensions make the bridge the longest span four lane, cable-stayed structure in the world. Called the Atlantic Bridge, construction started on the link in early 2013. The new link will help reduce journey times for commuters as well as helping Panama’s tourist trade. Design work for the project was carried out jointly by the China Communication Construction Company and Louis Berger Group (WSP Global).

Related Content

  • US$1.7 billion Francis Scott Key Bridge replacement design
    February 6, 2025
    The design of the US$1.7 billion Francis Scott Key Bridge replacement is revealed.
  • Turkey is investing in new motorway and bridge projects
    May 29, 2013
    Turkey is benefiting from new motorway and bridge projects constructed along the BOT model - Gülay Malkoç. Looking at Turkey’s economic development, road construction plays a crucial role. The investment in Turkey is becoming increasingly attractive for both local and foreign investors. There are significant huge road investments and projects being made in Turkey at present, compared with EU countries where the roads need mostly repair and maintenance. According to the approach of Turkey’s Ministry of Trans
  • UK: Work starts on Mersey Gateway main bridge deck
    June 2, 2016
    Work has started on 2.2km Mersey Gateway’s main bridge deck as the project enters its third year of construction. The new six-lane toll bridge will link the English towns of Runcorn and Widnes and teams will begin to connect the steel support cables to the deck and upper pylons this summer. Trinity, the project’s movable scaffolding system (MSS), has cast the first 250m of the north approach viaduct and a new MSS is on its way to Halton to build the south approach viaduct. The local road network is al
  • New Thames River bridge crossing proposed for UK capital London
    July 2, 2014
    Plans are once more being put forward for a new bridge spanning the River Thames in East London. The proposed structure is expected to cost in the region of €750 million (£600 million) to build and has been designed by Arup and HOK. The campaign for the new bridge is being led by the London Chamber of Commerce and Industry (LCCI), which says that there is a desperate need for an additional crossing. The campaign group also has the support of City Airport, which lies on the north side of the Thames and would