Skip to main content

New Panama Canal bridge crossing

Work is now complete the Panama Canal third bridge project. Costing US$590 million, the bridge features two lanes in either direction. Called the Atlantico Bridge, construction started on the link in early 2013. The new link will help reduce journey times for commuters as well as helping Panama’s tourist trade.
August 7, 2019 Read time: 1 min

Work is now complete for the Panama Canal third bridge project. Costing US$590 million, the bridge features two lanes in either direction and has a 530m central span. These dimensions make the bridge the longest span four lane, cable-stayed structure in the world. Called the Atlantic Bridge, construction started on the link in early 2013. The new link will help reduce journey times for commuters as well as helping Panama’s tourist trade. Design work for the project was carried out jointly by the China Communication Construction Company and Louis Berger Group (WSP Global).

Related Content

  • Bosphorus crossing updates
    November 29, 2013
    A group of seven banks is to fund the construction of the third Bosphorus Bridge crossing in Turkish commercial centre Istanbul. A group of six Turkish banks, Garanti Bankasi, Halk Bankasi, Is Bankasi, Vakiflar Bankasi, Ziraat Bankasi, and Yapi Kredi Bankasi, is being joined by the Netherlands-based Garantibank International to provide the necessary US$2.3 billion of funding required for the project. A joint Italian-Turkish consortium comprising Astaldi and IC Ictas will build the bridge, which will reduce
  • $6.2 billion New Jersey Turnpike project
    May 16, 2025
    Approval is given for the $6.2 billion New Jersey Turnpike project.
  • Successful resurfacing at New York's JFK Airport
    May 3, 2012
    A huge logistics operation has been carried out successfully at New York's JFK Airport. One of the busiest runways at one of the world's busiest airports is now open to air traffic again, following a 120 day closure for resurfacing.
  • Far from formulaic
    January 4, 2013
    Formwork solutions for the first axial suspension cable stayed bridge in India; and a four-lane road bridge in Germany’s Harz Mountains, are among the latest bridge-based formwork projects analysed by Guy Woodford. RMD Kwikform India has won the contract to design and supply shoring and formwork solutions for the first axial suspension cable stayed bridge ever built in India. The Kota Bridge’s innovative design sees a single 350m span cross the entire width of the Chambal River, with three approach spans on