Skip to main content

New Panama bridge project due

Construction work for the fourth bridge crossing over the Panama Canal is expected to commence in late 2019. The project is costing US$1.42 billion and the new bridge will be built by a Chinese contracting consortium comprising China Harbour Engineering Company (CHEC) and China Communications Construction Company (CCCC). The 6.5km bridge will feature three lanes in either direction, as well as two light rail tracks.
April 4, 2019 Read time: 1 min

Construction work for the fourth bridge crossing over the Panama Canal is expected to commence in late 2019. The project is costing US$1.42 billion and the new bridge will be built by a Chinese contracting consortium comprising China Harbour Engineering Company (CHEC) and China Communications Construction Company (CCCC). The 6.5km bridge will feature three lanes in either direction, as well as two light rail tracks.

Related Content

  • Dragados among six in the running for fourth Panama bridge deal
    August 23, 2016
    All six consortia that submitted documents in May to design and build a fourth bridge over the Panama Canal have pre-qualified, according to media reports. The companies officially vying for the estimated US$1 billion contract are: • Dragados • Consorcio CCB: Constructora Norberto Odebrecht, Odebrecht Engenharia e Construcao International • Consorcio Hyundai, Sacyr JV • Consorcio Astaldi – Daelim • Consorcio Panamá Cuarto Puente: China Communications Contruction Company, China Harbour Engi
  • Panama postpones project for fourth bridge tender
    September 14, 2017
    Panama has postponed the tender process for the fourth bridge crossing over the Panama Canal. This is the fourth time the fourth bridge crossing tender has been postponed. Panama’s Ministry of Public Works (MOP) opted to postpone the tender due to changes in the guidelines. The bridge will have six lanes for motor vehicles as well as twin tracks for metro rail and is expected to cost US$1 billion to construct.
  • Consortium designing Panama Canal crossing
    February 15, 2012
    The contract to design the third bridge spanning the Panama Canal will be carried out by Louis Berger and China Communications Construction.
  • New Panama Canal bridge crossing
    August 7, 2019
    Work is now complete the Panama Canal third bridge project. Costing US$590 million, the bridge features two lanes in either direction. Called the Atlantico Bridge, construction started on the link in early 2013. The new link will help reduce journey times for commuters as well as helping Panama’s tourist trade.