Skip to main content

New Ohio River Bridge project on track

Plans are on track for the new Ohio River Bridge project in the US. Bilfinger Berger Global Infrastructure SIVAC has completed at acquisition of a 33.33% stake in this PPP project. The construction portion of the project will be handled through a joint venture between VINCI Construction Grand Projects and Walsh Construction. The PPP concession package involves designing, building, operating and maintaining a cable stayed bridge over the Ohio River. The work will also include constructing link roads and asso
February 3, 2014 Read time: 1 min
Plans are on track for the new Ohio River Bridge project in the US. Bilfinger Berger Global Infrastructure SIVAC has completed at acquisition of a 33.33% stake in this PPP project. The construction portion of the project will be handled through a joint venture between 3085 Vinci Construction Grand Projects and 3473 Walsh Construction. The PPP concession package involves designing, building, operating and maintaining a cable stayed bridge over the Ohio River. The work will also include constructing link roads and associated roadway.

For more information on companies in this article

Related Content

  • Manitowoc MLC650 cranes keep Champlain Bridge on track
    October 28, 2016
    Two Manitowoc MLC650s are working on a project to replace the Champlain Bridge that spans the Saint Lawrence River in Montreal, Canada. The engineering consortium - Signature on the Saint Lawrence Construction (SSLC) – is assigned to the task. The capacity and reduced ground preparation made possible by the MLC650’s VPC-MAX attachment – as well as the ease of use of its Crane Control System (CCS) – are helping the team stay on schedule. The Champlain Bridge connects one of North America’s busiest road
  • Towers of power: California’s Gerald Desmond Bridge Replacement
    May 8, 2019
    Challenging ground conditions meant a design rethink - and some engineering firsts - for California’s Gerald Desmond Bridge Replacement Project* The Port of Long Beach on Terminal Island south of Los Angeles is the second-busiest container port in the US. It handles around 15% of all imported goods, much of it with Asia. As the Port of Long Beach was growing in importance over the past half century, the 51-year-old Gerald Desmond Bridge has faithfully been delivering thousands of daily commuters to wo
  • Peruvian toll road 'environmentally sound'
    February 23, 2012
    The International Road Federation's Global Road Achievement Awards (GRAA) programme is a competition to honour and recognise road-industry projects that demonstrate excellence and innovation in road development worldwide.
  • Cranes help construct major bridge project in CHina
    September 8, 2014
    A number of tower cranes have helped complete the Chishi Grand Bridge project in China Six Potain tower cranes were used to build two 280m tall bridge pylons, high in the clouds above the mountains of southern China. The cranes spent 30 months building the pylons at the Chishi Grand Bridge, which will span 1.47km and carry its road deck 180m above the ground. The bridge will open at the end of 2014.