Skip to main content

New Ohio River Bridge project on track

Plans are on track for the new Ohio River Bridge project in the US. Bilfinger Berger Global Infrastructure SIVAC has completed at acquisition of a 33.33% stake in this PPP project. The construction portion of the project will be handled through a joint venture between VINCI Construction Grand Projects and Walsh Construction. The PPP concession package involves designing, building, operating and maintaining a cable stayed bridge over the Ohio River. The work will also include constructing link roads and asso
February 3, 2014 Read time: 1 min
Plans are on track for the new Ohio River Bridge project in the US. Bilfinger Berger Global Infrastructure SIVAC has completed at acquisition of a 33.33% stake in this PPP project. The construction portion of the project will be handled through a joint venture between 3085 Vinci Construction Grand Projects and 3473 Walsh Construction. The PPP concession package involves designing, building, operating and maintaining a cable stayed bridge over the Ohio River. The work will also include constructing link roads and associated roadway.

For more information on companies in this article

Related Content

  • Turkish highways and bridge project financing secured
    June 7, 2018
    The financing package that will pay for Turkey’s €2.43 billion Malkara to Çanakkale highway and 1915 Çanakkale Bridge has now been secured. This follows on from Mott MacDonald completing its technical due diligence of the project documentation. The project will be handled under the PPP model. The centrepiece of the project is the €1.68 billion Çanakkale 1915 bridge. This will be over 4.6km long, with a 2,023m main span that will be the longest in the world for a suspension bridge. It will allow a clearance
  • Bidders announced for Panama project
    June 18, 2012
    The consortium made up of Acciona Infraestructuras and Tradeco from Spain and Mexico and the consortium made up of Odebrecht and Hyundai Joint Venture from Brazil and South Korea plus Vinci Construction Grands Projets from France have pre-quali ed in the tender for the construction of a new bridge at the Atlantic side of the Panama Canal. The second stage of the selection process will involve the client Panama Canal Authority (ACP) sending the contract terms and conditions to bidders. The 75m high and 4.6k
  • Three consortia to make final bids for Gordie Howe International Bridge
    January 25, 2016
    The Windsor-Detroit Bridge Authority has chosen three final bidders for the six-lane Gordie Howe International Bridge to be built between the Canadian city of Windsor and Detroit in the US state of Michigan. The estimated US$2 billion toll bridge, to be built under a public private partnership, is expected to be finished by 2020.
  • Peri’s formwork and shoring solution for the “East End Crossing”
    July 6, 2016
    Pylons almost 90m high are a striking feature of a new cable-stayed East End Crossing bridge over the Ohio River in Louisville, Kentucky state in the US The pylons are characterised by their complex shapes and massive legs and cross beams. Peri provided a comprehensive overall concept for its construction – consisting of a planning solution with perfectly matched formwork, climbing, shoring and scaffolding systems along with extensive on-site support. With a Peri solution, the construction crew were a