Plans are on track for the new Ohio River Bridge project in the US. Bilfinger Berger Global Infrastructure SIVAC has completed at acquisition of a 33.33% stake in this PPP project. The construction portion of the project will be handled through a joint venture between VINCI Construction Grand Projects and Walsh Construction. The PPP concession package involves designing, building, operating and maintaining a cable stayed bridge over the Ohio River. The work will also include constructing link roads and asso
      
  
           
                          
                February 3, 2014
              
            
                          
                Read time: 1 min
              
                    
                Plans are on track for the new Ohio River Bridge project in the US. Bilfinger Berger Global Infrastructure SIVAC has completed at acquisition of a 33.33% stake in this PPP project. The construction portion of the project will be handled through a joint venture between 3085   Vinci Construction Grand Projects and 3473   Walsh Construction. The PPP concession package involves designing, building, operating and maintaining a cable stayed bridge over the Ohio River. The work will also include constructing link roads and associated roadway. 
 
      
     
     
         
         
        


