Skip to main content

New Norwegian bridge open to traffic

A new bridge is now open to traffic in Norway. The Hålogaland Bridge has a total length of 1,533m and a main span of 1,145m and is Norway's second longest suspension bridge. The structure was designed by COWI and crosses the deep waters of Rombaksfjorden in northern Norway. The bridge will improve road safety, as well as reducing the distance between Narvik and Bjerkvik by 18km. The pre-existing route around Rombaksfjorden is frequently exposed to landslides and the opening of the bridge shortens travel tim
December 11, 2018 Read time: 2 mins
COWI and Dissing+Weitling are both proud of the design work they put into the aesthetic new Hålogaland Bridge in northern Norway

A new bridge is now open to traffic in Norway. The Hålogaland Bridge has a total length of 1,533m and a main span of 1,145m and is Norway's second longest suspension bridge. The structure was designed by 8721 COWI and crosses the deep waters of Rombaksfjorden in northern Norway. The bridge will improve road safety, as well as reducing the distance between Narvik and Bjerkvik by 18km. The pre-existing route around Rombaksfjorden is frequently exposed to landslides and the opening of the bridge shortens travel time between Narvik and the airport of Evenes by 20 minutes.

As the project engineer, long-span bridge specialist COWI provided the basic and detailed design for the bridge. The architect for the project was Dissing+Weitling architecture.

Located inside the Arctic Circle, the bridge features two 179m A-shaped towers. Poul Ove Jensen, director of Bridges at Dissing+Weitling, commented: “The bridge is located in a dramatic and magnificent scenery and for this reason, it has been our goal to design the bridge in respect of the natural surroundings. The anchor blocks are recessed in the hills and the only visible parts are the large concrete cones that receives the cable. Even the colours for the bridge are in harmony with the landscape's colours.”

COWI chief project manager Erik Sundet commented: “Opportunities to work on projects like this come very rarely for an engineer – and when they do, they block your calendar for so many years that you do not have time for many other projects on the same scale."

have collaborated on several projects including the Stonecutters Bridge in Hong Kong and Denmark’s Great Belt Link. They also worked together on the concept design of the Bjørnafjord Bridge, a multispan floating bridge which plans to use technology from the offshore industry to cross another deep – and wide – Norwegian fjord, the Bjørnafjorden.

For more information on companies in this article

Related Content

  • Ireland and Scotland link?
    March 1, 2018
    Politicians in Northern Ireland have again raised the prospect of bridge to link western Scotland the Irish island, according to media reports. The road and rail crossing as envisaged by the Democratic Union Party would cost close to €23 billion. It would run between the Irish town of Larne in County Antrim and the Dumfries and Galloway coastline in Scotland. The DUP said in its manifesto for the 2015 UK general election that there should be a feasibility study into building a bridge or tunnel.
  • Engineering elegance in bridge design
    July 9, 2012
    Multi-award-winning bridge designer Michel Virlogeux was the keynote speaker at the recent Austroads Bridge conference, held in Auckland, New Zealand, last month. He had a simple message: Bridge design is the realm of the engineer and should not be given to architects. "Bridge architecture, bridge aesthetics, bridge elegance is the problem of engineers. We must not leave this major part of our job to architects," he said. "I always work with an architect, but the architect is not selecting the structure. To
  • The UK’s Humber Bridge gets protected status
    July 28, 2017
    Any refurbishments to the Humber Bridge near the northern English city of Hull will be subject to intense scrutiny after being designated a historic site. The bridge - only 36-years old – was the longest single-span suspension bridge for 16 years until it was surpassed in 1998 with completion of Japan’s Akashi Kaikyō Bridge with a main span of 1.9km. The Humber Bridge now ranks eighth-longest as measured by its main span of 1.4km. Historic England, the listed structures designating authority, described the
  • Innovative formwork beats bridge design challenges
    February 14, 2012
    Companies are coming up with innovative formwork solutions to overcome "challenging" designs for bridges. Patrick Smith reports