Skip to main content

New New York-Newark, New Jersey bridge connection

US Transportation Secretary Anthony Foxx has revealed that a Transportation Infrastructure Finance Innovation Act (TIFIA) loan worth US$474 million will help pay for construction of the replacement for the current Goethals Bridge that connects Elizabeth, New Jersey with Staten Island, New York. The Port Authority of New York and New Jersey (PANYNJ), which operates the bridge, estimates that more than $33 billion in regional goods passes across the bridge each year. An average of 74,000 vehicles/day cross t
November 25, 2013 Read time: 2 mins

US Transportation Secretary Anthony Foxx has revealed that a Transportation Infrastructure Finance Innovation Act (TIFIA) loan worth US$474 million will help pay for construction of the replacement for the current Goethals Bridge that connects Elizabeth, New Jersey with Staten Island, New York.

The 2422 Port Authority of New York and New Jersey (PANYNJ), which operates the bridge, estimates that more than $33 billion in regional goods passes across the bridge each year. An average of 74,000 vehicles/day cross the bridge in both directions during the working week. But built in 1928 and now part of Interstate 278, its outdated design has no shoulders and narrow lanes, makes traffic flow difficult in emergencies.

A new cable-stayed bridge, with six much wider travel lanes, an outer shoulder and an inner shoulder on each roadway, will replace the existing bridge. The new bridge will also offer a sidewalk and bikeway along the northern edge of the New Jersey bound roadway and enough space between the eastbound and westbound roadway decks to accommodate possible transit service in the future.

The Goethals Bridge provides crucial access to Newark Airport from New York City and provides a connection between the New Jersey Turnpike, Routes 1 & 9 and other New Jersey highways, the Staten Island Expressway (I-278), and the Verrazano-Narrows Bridge.

The loan will go toward the $1.5 billion total cost of the project. The new bridge is being constructed through a private, long-term development contract with NYNJ Link, a consortium of 2378 Macquarie Infrastructure Real Assets and 1313 Kiewit Construction, which will receive the loan and design, build, finance and maintain the new bridge. The Port Authority of New York and New Jersey will maintain responsibility for setting and collecting tolls.

For more information on companies in this article

Related Content

  • Safety on Asia’s Highways: Brimming with Innovation reports IRF Washington office
    June 11, 2019
    While efforts to improve road safety on the Asian continent are finally starting to pay off, the challenge to reduce fatalities remains immense. According to the Asian Development Bank, 60% of the annual 1.2 million fatal traffic injuries take place on Asia’s road network. Many of the contributing factors to this epidemic such as deficient infrastructure, outdated standards, and poor enforcement can be addressed with proper political leadership, well trained agency staff, and knowledge resources. However,
  • Tolling - a way ahead for the US?
    February 17, 2012
    IBTTA president Frank McCartney has urged US Congress to remove the barriers to tolling and expand the TIFIA program.
  • New Kentucky-Ohio bridge link planned
    August 17, 2023
    A new Kentucky-Ohio bridge link is being planned.
  • Canada: LINK 427 wins Ontario’s Highway 427 Expansion contract
    March 16, 2017
    LINK 427 has been selected for the US$457 million design, build, finance and maintain contract for the Highway 427 Expansion project in Ontario province. The LINK team consists of ACS Infrastructure Canada, Dragados Canada, Bot Infrastructure, Brennan Infrastructures, MMM Group and Thurber Engineering. The project, in the Toronto area, includes a new 6.6km extension of Highway 427 from Highway 7 to Major Mackenzie Drive and widening of 4km from Finch Avenue to Highway 7. Work includes building thre