Skip to main content

New New York-Newark, New Jersey bridge connection

US Transportation Secretary Anthony Foxx has revealed that a Transportation Infrastructure Finance Innovation Act (TIFIA) loan worth US$474 million will help pay for construction of the replacement for the current Goethals Bridge that connects Elizabeth, New Jersey with Staten Island, New York. The Port Authority of New York and New Jersey (PANYNJ), which operates the bridge, estimates that more than $33 billion in regional goods passes across the bridge each year. An average of 74,000 vehicles/day cross t
November 25, 2013 Read time: 2 mins

US Transportation Secretary Anthony Foxx has revealed that a Transportation Infrastructure Finance Innovation Act (TIFIA) loan worth US$474 million will help pay for construction of the replacement for the current Goethals Bridge that connects Elizabeth, New Jersey with Staten Island, New York.

The 2422 Port Authority of New York and New Jersey (PANYNJ), which operates the bridge, estimates that more than $33 billion in regional goods passes across the bridge each year. An average of 74,000 vehicles/day cross the bridge in both directions during the working week. But built in 1928 and now part of Interstate 278, its outdated design has no shoulders and narrow lanes, makes traffic flow difficult in emergencies.

A new cable-stayed bridge, with six much wider travel lanes, an outer shoulder and an inner shoulder on each roadway, will replace the existing bridge. The new bridge will also offer a sidewalk and bikeway along the northern edge of the New Jersey bound roadway and enough space between the eastbound and westbound roadway decks to accommodate possible transit service in the future.

The Goethals Bridge provides crucial access to Newark Airport from New York City and provides a connection between the New Jersey Turnpike, Routes 1 & 9 and other New Jersey highways, the Staten Island Expressway (I-278), and the Verrazano-Narrows Bridge.

The loan will go toward the $1.5 billion total cost of the project. The new bridge is being constructed through a private, long-term development contract with NYNJ Link, a consortium of 2378 Macquarie Infrastructure Real Assets and 1313 Kiewit Construction, which will receive the loan and design, build, finance and maintain the new bridge. The Port Authority of New York and New Jersey will maintain responsibility for setting and collecting tolls.

For more information on companies in this article

Related Content

  • PPRS Nice 2018: maintenance moves mountains
    June 22, 2018
    Strategic maintenance was a major theme at the second Pavement Preservation and Recycling Summit in Nice, France. The world is changing, mobility is changing and so roads must change and adapt for the future.” With this brief statement, Jacques Tavernier opened the second PPRS Summit. “At the same time there is a growing awareness of poor or non-existent maintenance for highways. The question for this conference is how to adapt road maintenance in the face of this challenge,” said Tavernier, in his role as
  • Mersey Gateway Project reaches half-way point across the Mersey
    March 10, 2017
    The Mersey Gateway project in England has passed a significant milestone, with over half of the main bridge deck stretching across the River Mersey. Work to install stay cables on the main bridge also passed a key point, with installation of the 31st 150m long cable – the halfway point for stay cable installations on the pylon. When complete, 146 stay cables will support the 1km-long reinforced concrete bridge, with a combined load-bearing weight of more than 53,000tonnes. “We’re now more than 50
  • Texan tolling
    February 7, 2012
    Work is now underway on the new DFW Connector near Dallas, in the US state of Texas. This is of note as it is the largest investment of Recovery Act (ARRA) investment in a highway project so far.
  • Fast-track Biloxi Bay bridge
    July 18, 2012
    Construction of a bridge destroyed in a hurricane was completed early, and with some added aesthetic benefits Hurricane Katrina, one of the deadliest and costliest natural disasters in US history, made landfall on 29 August, 2005, devastating the Gulf Coast. The US 90 Bridge over Biloxi Bay (connecting the communities of Biloxi and Ocean Springs, Mississippi) was one of many major highway and railroad bridges knocked out of service due to extensive storm damage. The eye of the storm passed 96km west of Bilo