Skip to main content

New New York-Newark, New Jersey bridge connection

US Transportation Secretary Anthony Foxx has revealed that a Transportation Infrastructure Finance Innovation Act (TIFIA) loan worth US$474 million will help pay for construction of the replacement for the current Goethals Bridge that connects Elizabeth, New Jersey with Staten Island, New York. The Port Authority of New York and New Jersey (PANYNJ), which operates the bridge, estimates that more than $33 billion in regional goods passes across the bridge each year. An average of 74,000 vehicles/day cross t
November 25, 2013 Read time: 2 mins

US Transportation Secretary Anthony Foxx has revealed that a Transportation Infrastructure Finance Innovation Act (TIFIA) loan worth US$474 million will help pay for construction of the replacement for the current Goethals Bridge that connects Elizabeth, New Jersey with Staten Island, New York.

The 2422 Port Authority of New York and New Jersey (PANYNJ), which operates the bridge, estimates that more than $33 billion in regional goods passes across the bridge each year. An average of 74,000 vehicles/day cross the bridge in both directions during the working week. But built in 1928 and now part of Interstate 278, its outdated design has no shoulders and narrow lanes, makes traffic flow difficult in emergencies.

A new cable-stayed bridge, with six much wider travel lanes, an outer shoulder and an inner shoulder on each roadway, will replace the existing bridge. The new bridge will also offer a sidewalk and bikeway along the northern edge of the New Jersey bound roadway and enough space between the eastbound and westbound roadway decks to accommodate possible transit service in the future.

The Goethals Bridge provides crucial access to Newark Airport from New York City and provides a connection between the New Jersey Turnpike, Routes 1 & 9 and other New Jersey highways, the Staten Island Expressway (I-278), and the Verrazano-Narrows Bridge.

The loan will go toward the $1.5 billion total cost of the project. The new bridge is being constructed through a private, long-term development contract with NYNJ Link, a consortium of 2378 Macquarie Infrastructure Real Assets and 1313 Kiewit Construction, which will receive the loan and design, build, finance and maintain the new bridge. The Port Authority of New York and New Jersey will maintain responsibility for setting and collecting tolls.

For more information on companies in this article

Related Content

  • RFQ is out for the Gordie Howe Bridge to link US and Canada
    July 22, 2015
    The bidding process has started for the Gordie Howe International Bridge that will link Detroit in the US state of Michigan and Windsor, in the Canadian province of Ontario. The Windsor-Detroit Bridge Authority (WDBA) has sent out a request for qualifications (RFQ) for the bridge that will likely be either cable stayed or suspension to cross the Detroit River. The bridge also likely will come with a hefty price tag – around US$1.62 billion, as World Highways reported in May in a feature on the proposed b
  • US$190 million Florida road deal for Webuild
    October 28, 2024
    A US$190 million Florida road deal has been won by Webuild.
  • New version of world’s longest floating bridge
    August 12, 2014
    The creation of a new version of the world’s longest floating bridge in Seattle, in the US state of Washington, is among the world’s most eye-catching current bridge engineering projects. It is an impressive example of the health of the bridge replacement sector, particularly in the US, leaving it well placed for growth. Guy Woodford reports Already the world’s longest floating bridge at over 2,310m long, the Governor Albert D Rosellini-Evergreen Point Floating Bridge in Seattle in the United States is g
  • The Mersey Gateway bridge project continues on schedule
    October 18, 2016
    Work continues on the 2.3km Mersey Gateway signature bridge project close to Liverpool in the UK. David Arminas reports on some of the construction highlights. Under construction is a cable-stayed structure with three towers that will span the Mersey River’s expansive mud flats between the towns of Runcorn and Widnes near Liverpool. Including the approach viaducts on each side, it will be 2.3km long with a river span of 1km. The main bridge deck will be reinforced concrete. The 80m-high central tower will b