Skip to main content

New New York-Newark, New Jersey bridge connection

US Transportation Secretary Anthony Foxx has revealed that a Transportation Infrastructure Finance Innovation Act (TIFIA) loan worth US$474 million will help pay for construction of the replacement for the current Goethals Bridge that connects Elizabeth, New Jersey with Staten Island, New York. The Port Authority of New York and New Jersey (PANYNJ), which operates the bridge, estimates that more than $33 billion in regional goods passes across the bridge each year. An average of 74,000 vehicles/day cross t
November 25, 2013 Read time: 2 mins

US Transportation Secretary Anthony Foxx has revealed that a Transportation Infrastructure Finance Innovation Act (TIFIA) loan worth US$474 million will help pay for construction of the replacement for the current Goethals Bridge that connects Elizabeth, New Jersey with Staten Island, New York.

The 2422 Port Authority of New York and New Jersey (PANYNJ), which operates the bridge, estimates that more than $33 billion in regional goods passes across the bridge each year. An average of 74,000 vehicles/day cross the bridge in both directions during the working week. But built in 1928 and now part of Interstate 278, its outdated design has no shoulders and narrow lanes, makes traffic flow difficult in emergencies.

A new cable-stayed bridge, with six much wider travel lanes, an outer shoulder and an inner shoulder on each roadway, will replace the existing bridge. The new bridge will also offer a sidewalk and bikeway along the northern edge of the New Jersey bound roadway and enough space between the eastbound and westbound roadway decks to accommodate possible transit service in the future.

The Goethals Bridge provides crucial access to Newark Airport from New York City and provides a connection between the New Jersey Turnpike, Routes 1 & 9 and other New Jersey highways, the Staten Island Expressway (I-278), and the Verrazano-Narrows Bridge.

The loan will go toward the $1.5 billion total cost of the project. The new bridge is being constructed through a private, long-term development contract with NYNJ Link, a consortium of 2378 Macquarie Infrastructure Real Assets and 1313 Kiewit Construction, which will receive the loan and design, build, finance and maintain the new bridge. The Port Authority of New York and New Jersey will maintain responsibility for setting and collecting tolls.

For more information on companies in this article

Related Content

  • Forming iconic structures
    July 18, 2012
    Specially designed and constructed formwork is being used to create some iconic bridges worldwide The Golden Ears Bridge over the Fraser River will unite the municipalities of Richmond, New Westminister and Delta in the scenic British Columbia province of Canada. The bridge, part of a CAD$800 million (US$670 million) project, is an 'extra dosed' cable stayed bridge, which means the deck will be supported by both cables and the structure itself. This design reduces the overall height of the two towers as req
  • Terex cranes in a tight spot in Michigan
    February 6, 2017
    Terex cranes have been involved in a multiple bridge repair project in the US More than 96,000 vehicles per day travel a stretch of I-96, including its 52-year-old bridges. The Michigan Department of Transportation is in the midst of a two-year US$77 million project to repair bridges and relieve increasing congestion along Interstate 96 at the U.S. Highway 23 interchange in Livingston County. Toebe Construction along with joint venture partner Kamminga & Roodvoets are bringing in a lot of lifting powe
  • The US FAST Act: a job left unfinished
    April 4, 2016
    US roads and bridges are crumbling at an alarming rate as state governments wring their hands over the increasingly scarce money for repairs. Enter the FAST Act. But is it enough? US state transportation department officials, as well as highway contractors and operators, breathed a sigh of relief in December. For months the highways infrastructure sector waited anxiously to see where the necessary money for road projects would come from. For several years, the Highways Trust Fund – the usual way of paying f
  • Kuwait’s Sheikh Jaber al-Ahmad Al-Sabah Causeway opens
    August 27, 2019
    World Highways revisits the world’s fourth longest sea bridge - four years to construct and which has slashed travel time between Kuwait’s largest island and the capital city