Skip to main content

New Morocco link to motorways

A new link for Morroco’s road network will connect the port of Kénitra Atlantique to the country’s motorway system. Morocco’s Ministry of Infrastructure is commissioning a study to analyse the possible routes and feasibility for the new port link.
September 8, 2016 Read time: 1 min

A new link for Morroco’s road network will connect the port of Kénitra Atlantique to the country’s motorway system. Morocco’s Ministry of Infrastructure is commissioning a study to analyse the possible routes and feasibility for the new port link. This stretch of road will be built to a motorway standard and will link with the A2 motorway that also provides connectivity to Fez and Meknes. The new motorway stretch will also connect with the A1 route running northwards to Tangiers.

Related Content

  • New highway connection for Algeria’s road network
    October 21, 2014
    Construction work on a 48km section of road connecting Tizi-Ouzou with Algeria’s East-West motorway is due for completion in 2016. The work is costing close to US$960 million, according to the Algerian Public Works Ministry. In addition, construction work on a road connecting Aïn El Hammam with Draâ El Mizan is now commencing while the Algerian Public Works Ministry has said that the Northern Bypass will be completed as planned by the end of March 2015. Several of the country’s planned road infrastructure p
  • A new East Africa toll road linking Zambia and Tanzania
    October 30, 2023
    A new East Africa toll road is under construction to link Zambia with Tanzania.
  • Vitronic laser traffic control systems being installed in Morocco
    October 1, 2019
    Industrial vision supplier Vitronic has started to supply more than 500 traffic control systems to Morocco, working with local supplier Alomra Group International.
  • Four offers for Sibiu-Pitesti A1 motorway Lot 4 section
    September 4, 2019
    Main Site Taxonomy WH5 Sub Taxonomy ES08 Image supplied No Needs XSP Romania’s national road agency reports that it has four offers for both the design and construction of Lot 4 of the Sibiu-Pitesti A1 motorway. The National Company for the Administration of Road Infrastructure (CNAIR) said the value of the deal is around €427.5 million. Construction is likely to take 60 months - 16 months for design work and 44 for construction. The bidders are from China, Turkey, Austria and Italy. Lot