Skip to main content

New Mersey gateway bridge project underway

Work is starting on the approach viaducts for the new Mersey Gateway Bridge in the UK. The project is using longest bridge-building machine in Europe, which was named during a ceremony to mark the latest key stage the Mersey Gateway Project. Most machines of this kind can only build bridge spans of up to 60m. However, the MSS for the Mersey Gateway Bridge was specially made so it is able to cast spans of up to 70m.
September 23, 2015 Read time: 2 mins
The Mersey Gateway is a key project for the area
Work is starting on the approach viaducts for the new 6126 Mersey Gateway Bridge in the UK. The project is using longest bridge-building machine in Europe, which was named during a ceremony to mark the latest key stage the Mersey Gateway Project. Most machines of this kind can only build bridge spans of up to 60m. However, the MSS for the Mersey Gateway Bridge was specially made so it is able to cast spans of up to 70m.

It has taken construction teams three months to assemble the machine. This is no mean feat considering it includes approximately 1,200 components, 3,000 actual parts, and is held together by over 60,000 bolts. Now fully built, the MSS measures an impressive 157m long and weighs around 1,700tonnes. The MSS will now build the elevated road viaducts over the Mersey Estuary on both sides of the river, beginning with the north approach viaduct from the launch site at Catalyst Trade Park in Widnes.

The construction consortium Merseylink named the movable scaffolding system (MSS) at a special launching event at Catalyst Trade Park in Widnes. Merseylink held a competition for staff to name the MSS, with the winning name ‘Trinity' submitted by Lynn Jeary, who works in the project's communications team. The name Trinity symbolises the three bridge pylons as well as the three partners in the construction joint venture - Kier Infrastructure and Overseas Limited, Samsung C&T Corporation and FCC Construcción. The name also refers to the Merseylink bridge being sponsored by three major companies - Macquarie Capital, BBGI, and FCC.

For more information on companies in this article

Related Content

  • Alberta’s peaceful partnership
    May 4, 2020
    A bridge project in northern Canada threw up some unexpected challenges, reports David Arminas, from the banks of the Peace River in Alberta
  • Acrow, hydraulically driven in NY
    August 18, 2020
    Detour bridges over Westchester Creek in the Bronx, part of greater New York city, are reportedly the first hydraulically-driven temporary lift bridges in the US
  • New bridge over Nile will help landlocked Uganda
    April 3, 2013
    A new River Nile bridge is essential to boost trade and improve traffic in landlocked Uganda. Shem Oirere reports A new bridge across the River Nile at Jinja, to be constructed by Uganda, is promising to boost trade in eastern Africa and pave the way for smooth and safe traffic in and out of this landlocked country. The bridge, also known as the Second Nile Bridge, is the first cable-stayed bridge in the region and will be constructed at Njeru, 80km east of the Ugandan capital Kampala, along the Kampala-Jin
  • Cranes help construct major bridge project in China
    September 8, 2014
    A number of tower cranes have helped complete the Chishi Grand Bridge project in China. Six Potain tower cranes were used to build two 280m tall bridge pylons, high in the clouds above the mountains of southern China. The cranes spent 30 months building the pylons at the Chishi Grand Bridge, which will span 1.47km and carry its road deck 180m above the ground. The bridge will open at the end of 2014.