Skip to main content

New Mersey gateway bridge project underway

Work is starting on the approach viaducts for the new Mersey Gateway Bridge in the UK. The project is using longest bridge-building machine in Europe, which was named during a ceremony to mark the latest key stage the Mersey Gateway Project. Most machines of this kind can only build bridge spans of up to 60m. However, the MSS for the Mersey Gateway Bridge was specially made so it is able to cast spans of up to 70m.
September 23, 2015 Read time: 2 mins
The Mersey Gateway is a key project for the area
Work is starting on the approach viaducts for the new 6126 Mersey Gateway Bridge in the UK. The project is using longest bridge-building machine in Europe, which was named during a ceremony to mark the latest key stage the Mersey Gateway Project. Most machines of this kind can only build bridge spans of up to 60m. However, the MSS for the Mersey Gateway Bridge was specially made so it is able to cast spans of up to 70m.

It has taken construction teams three months to assemble the machine. This is no mean feat considering it includes approximately 1,200 components, 3,000 actual parts, and is held together by over 60,000 bolts. Now fully built, the MSS measures an impressive 157m long and weighs around 1,700tonnes. The MSS will now build the elevated road viaducts over the Mersey Estuary on both sides of the river, beginning with the north approach viaduct from the launch site at Catalyst Trade Park in Widnes.

The construction consortium Merseylink named the movable scaffolding system (MSS) at a special launching event at Catalyst Trade Park in Widnes. Merseylink held a competition for staff to name the MSS, with the winning name ‘Trinity' submitted by Lynn Jeary, who works in the project's communications team. The name Trinity symbolises the three bridge pylons as well as the three partners in the construction joint venture - Kier Infrastructure and Overseas Limited, Samsung C&T Corporation and FCC Construcción. The name also refers to the Merseylink bridge being sponsored by three major companies - Macquarie Capital, BBGI, and FCC.

For more information on companies in this article

Related Content

  • Pre-stressed bridge decks use modular formwork system
    July 9, 2012
    Imaginative formwork, often using modular components, is helping to shape some challenging bridges worldwide. Patrick Smith reports Traffic volumes in and around Prague have swollen massively in recent years, pushing the existing road network to the limits of its capacity. To permanently ease congestion in the Czech capital's centre, a multi-lane orbital motorway is under construction as a high capacity bypass for central Prague and to link up all the motorways and other major highways radiating from the ci
  • Lower Thames Crossing contractor shortlist
    September 27, 2021
    The contractor shortlist has been announced for part of the Lower Thames Crossing.
  • Formwork innovations help bridge building
    July 7, 2015
    A series of formwork developments are helping with challenging bridge construction projects around the world - Mike Woof writes In the Polish city of Krakow, a cost-effective cable stayed bridge is being constructed using a balanced cantilever technique. The current expansion of the Krakow metropolitan railway network (KST) requires the building of a crossing of the Krakow-Plaszow railway junction. Ensuring that daily rail operations remained unaffected during the construction of the 252m long crossing w
  • Bridge engineering worldwide
    July 1, 2013
    Guy Woodford looks at vital bridge construction, repair and inspection projects in China, Europe, North America and Australia The Heron Road Bridge in Ottawa, Ontario in Canada is a vital link within the City’s transport network, as it crosses the Rideau River, which divides the east and west parts of the City. Constructed in 1966-1967, the Heron Road Bridge is approximately 275m long and includes six lanes.