Skip to main content

New Malaysian road links planned

New Malaysian road links are being planned.
By MJ Woof March 23, 2021 Read time: 1 min
New road projects are planned for Malaysia – image courtesy of © Indos82, Dreamstime.com
Proposals are being put forward for improvement works to an 80km road stretch forming part of the North-South Expressway (NSE) in Malaysia. The plans call for the current road connecting Yong Pen and Senai Utara to be widened and upgraded in the first stage of the project. The second stage of the works would be to carry out similar improvements to the stretch between Muar and Yong Pen.

Official approvals for the works are being sought at present by the local authorities. The project is expected to cost close to US$668 million. The work is needed as the existing road is unable to cope with current traffic demand and suffers congestion and delays at peak periods.

Meanwhile, a new road connection linking Malaysia and Indonesia is being planned, in addition to new border crossing facilities. The new crossing is intended to improve transport between Malaysia and Indonesia’s new capital on Kalimantan. The project is expected to cost $148.4 million. The crossing will connect Serudong in Malaysia with Simanggaris in Indonesia.

Related Content

  • Bridge under discussion for UK's Thames River
    March 22, 2012
    Engineering specialist AECOM will carry out a study into the proposed Lower Thames Crossing project in the UK.
  • India’s new highway links are being built
    September 29, 2016
    Road development work continues in India, with the country planning its highway infrastructure expansion. The projects are being planned by the National Highways Authority of India (NHAI). A new 127km highway will connect Lucknow with Sultanpur in Uttar Pradesh. The four lane route will also pass through Ayyubganj and Musafirkhana and is expected to cost in the region of US$425.3 million to construct. The work is being carried out by the contractor Dilip Buildon.
  • Angola road projects are being awarded
    July 26, 2017
    In Angola’s capital Luanda, three key road projects have now been awarded, with the work intended to help improve urban traffic flow and cut congestion at peak periods. One project will be carried out by the Chinese contractor China Railway 20 Group International. This project is worth some US$142.3 million and is for the second stage of the South-West Luanda Boulevard, which will run along the coast. Contractor Tecnovia Angola will handle the work for the other two projects. One is the $1 billion project f
  • Koh Samui-Surat Thani bridge still on
    April 14, 2025
    Surachet Laopoolsuk, head of the Expressway Authority, Exat, reportedly said that the bridge could be open by 2034.