Skip to main content

New Malaysian highway project

Plans are in hand in Malaysia to build a new highway costing US$1.06 billion. The route will run from Jelapang-Selama-Batu Kawan and the proposal has been put forward by Beta Mutiara. The three-lane highway will stretch for 116km between Jelapang, Perak and Batu Kawan, Penang. Should the work get the go ahead the project would be carried out by Beta Mutiara subsidiary BMT Jelas.
December 14, 2015 Read time: 1 min
Plans are in hand in Malaysia to build a new highway costing US$1.06 billion. The route will run from Jelapang-Selama-Batu Kawan and the proposal has been put forward by Beta Mutiara. The three-lane highway will stretch for 116km between Jelapang, Perak and Batu Kawan, Penang. Should the work get the go ahead the project would be carried out by Beta Mutiara subsidiary BMT Jelas.

Related Content

  • Funding for Tasmania road upgrades
    January 30, 2017
    Funding is required to pay for a series of road upgrades in Australia’s Tasmania State. According to the Australian motoring group, Royal Automobile Club of Tasmania (RATC), some US$1.06 billion (S$1.4 billion) is required for the work. RATC has asked the Tasmania State Government to provide the funds necessary for the work. Key projects include replacing the Bridgewater Bridge and upgrading the Midland Highway. These projects will cost $454.3 million (A$600 million) and $302.86 million (A$400 million) resp
  • Major Chinese road tenders are opening for bids
    October 26, 2023
    Major Chinese road project tenders are now opening for bids.
  • Nicaragua building new coastal highway
    January 26, 2017
    Nicaragua is planning to build a new coastal highway that will improve transport connections between capital Managua and Rivas in the south of the country. Work on the design of the first section of the new highway is now commencing. The route will run close to Nicaragua’s Pacific Coast and is intended to boost trade and transport. The contractor that will carry out the construction work has yet to be finalised although initial plans had suggested that the firm Inocsa-Edicro would be responsible. A 131km hi
  • Stonehenge Tunnel project faces further questions
    May 22, 2019
    Plans to construct a tunnel link for the A303 route past the famous Stonehenge monument have hit further problems.