Skip to main content

New Malaysian highway project

Plans are in hand in Malaysia to build a new highway costing US$1.06 billion. The route will run from Jelapang-Selama-Batu Kawan and the proposal has been put forward by Beta Mutiara. The three-lane highway will stretch for 116km between Jelapang, Perak and Batu Kawan, Penang. Should the work get the go ahead the project would be carried out by Beta Mutiara subsidiary BMT Jelas.
December 14, 2015 Read time: 1 min
Plans are in hand in Malaysia to build a new highway costing US$1.06 billion. The route will run from Jelapang-Selama-Batu Kawan and the proposal has been put forward by Beta Mutiara. The three-lane highway will stretch for 116km between Jelapang, Perak and Batu Kawan, Penang. Should the work get the go ahead the project would be carried out by Beta Mutiara subsidiary BMT Jelas.

Related Content

  • Major Mexican motorway plan in hand
    February 2, 2015
    The Mexican Government plans to invest some US$13.72 billion in all into 46 motorway construction projects. Work on these new routes will be carried out during the current administration. The new motorways come in addition to the 85 motorways operating in 2012, when the current administration entered office. So far 13 new motorways have been built with funds of close to $3.77 billion. The 1.4km Distribuidor Vial Palmira motorway was recently opened inaugurated while the 10 lane Cuernavaca beltway project ha
  • New Malaysian highway to cut congestion
    April 22, 2014
    The new Kinrara-Damansara Skyway (Kidex) being planned for Malaysia is expected to help reduce traffic congestion. A study carried out by SKM-CB Colin Buchanan-Sinclair Knight Merz in 2011 indicated that the highway will be able to lower travelling time between Damansara and Kinrara by 25%. Meanwhile the volume of traffic in both directions from Puchong to Petaling Jaya will be lessened by 50%. From Taman Tun Dr Ismail, from Bandar Utama to Petaling Jaya and from the New Klang Valley Expressway (NKVE), traf
  • Planned Papua New Guinea highway project
    July 24, 2020
    The cost of a planned Papua New Guinea highway project has been revealed.
  • Major Malaysian highway projects in hand
    July 24, 2013
    Malaysia’s Lebuh Raya Pantai Timur 2 (LPT2), highway is expected to open for traffic by September 2014. A series of delays have held back work on the 184km highway, although the 72km Bukit Besi-Kuala Terengganu section has been open since the third quarter of 2011. Some of the delays can be attributed to price increases in the cost of materials, which caused problems for contractors involved with the project. Work is ongoing at present on the section of highway from Bukit Mempusi-Kemamn's Felda Kerteh 6. Me