Skip to main content

New Malaysian highway project

Plans are in hand in Malaysia to build a new highway costing US$1.06 billion. The route will run from Jelapang-Selama-Batu Kawan and the proposal has been put forward by Beta Mutiara. The three-lane highway will stretch for 116km between Jelapang, Perak and Batu Kawan, Penang. Should the work get the go ahead the project would be carried out by Beta Mutiara subsidiary BMT Jelas.
December 14, 2015 Read time: 1 min
Plans are in hand in Malaysia to build a new highway costing US$1.06 billion. The route will run from Jelapang-Selama-Batu Kawan and the proposal has been put forward by Beta Mutiara. The three-lane highway will stretch for 116km between Jelapang, Perak and Batu Kawan, Penang. Should the work get the go ahead the project would be carried out by Beta Mutiara subsidiary BMT Jelas.

Related Content

  • Nepal's new bridge link
    February 13, 2012
    Construction work is underway in Nepal on one of the biggest box-girder bridges ever built in the country. The bridge is located in Mid West Nepal and measures just over 1km long.
  • Major road tunnel project in Malaysia delayed
    January 11, 2016
    The planned Penang project is postponed in Malaysia. This major road tunnel project will be delayed. The project is expected to cost US$1.42 billion and the work will be carried out by the Consortium Zenith BUCG (CZBUCG). For the first phase, three highways with a combined length of 21.2km will be constructed. They are the Air Itam to Tun Dr Lim Chong Eu Expressway bypass, the Gurney Drive to Tun Dr Lim Chong Eu Expressway bypass and the Jalan Tanjung Bungah-Teluk Bahang paired-road. The delay has been attr
  • Malaysia actions Pan Borneo highway projects
    December 20, 2016
    Malaysia is pushing ahead with a series of construction projects that will form sections of the Pan Borneo Highway in Sarawak. Work will go ahead on eight sections of this important route and this will form phase one of the project, with the cost anticipated as some US$3.05 billion. The eight packages consist of the 95km stretch from Sematan to Sungai Moyan Bridge, an 89km stretch connecting Pantu Interchange with Batang Skrang and the 80km section from Sungai Tangap Interchange to the Pujut Link Road. They
  • New international trade crossing linking Canada and US
    June 9, 2015
    The Detroit River is short, only 45km, and narrow in places, less than 1km. Around a quarter of the annual $658 billion Canada-US trade crosses over the river. That’s $160 billion worth of goods trucked each year between Detroit in the US state of Michigan and the Canadian city of Windsor in the province of Ontario - the Windsor-Detroit Corridor. There are several types of crossings, but the vast majority of commercial traffic must use the 2.3km Ambassador Bridge (see box). A new bridge was initially prop