Skip to main content

New Malaysian highway to cut congestion

The new Kinrara-Damansara Skyway (Kidex) being planned for Malaysia is expected to help reduce traffic congestion. A study carried out by SKM-CB Colin Buchanan-Sinclair Knight Merz in 2011 indicated that the highway will be able to lower travelling time between Damansara and Kinrara by 25%. Meanwhile the volume of traffic in both directions from Puchong to Petaling Jaya will be lessened by 50%. From Taman Tun Dr Ismail, from Bandar Utama to Petaling Jaya and from the New Klang Valley Expressway (NKVE), traf
April 22, 2014 Read time: 2 mins
The new Kinrara-Damansara Skyway (Kidex) being planned for Malaysia is expected to help reduce traffic congestion. A study carried out by SKM-CB Colin Buchanan-1524 Sinclair Knight Merz in 2011 indicated that the highway will be able to lower travelling time between Damansara and Kinrara by 25%. Meanwhile the volume of traffic in both directions from Puchong to Petaling Jaya will be lessened by 50%. From Taman Tun Dr Ismail, from Bandar Utama to Petaling Jaya and from the New Klang Valley Expressway (NKVE), traffic volume will reduce by some 30%. The study will be updated to take the newest traffic conditions into consideration. Some 90% of Kidex will be elevated and will be built over existing Petaling Jaya roads. The 14.9km Kidex project, which has been given in principal approval from the government, will have seven interchanges and two tolls. More highways are required in Malaysia due to the increasing number of cars on the road. A 2008 study showed that by 2025, Malaysia would have 3.9 million cars on the road.

Related Content

  • Vietnam’s new road works are being announced
    December 21, 2021
    Vietnam’s new road construction and improvement works are being announced.
  • Machine control technology shortens road contract
    May 28, 2013
    The use of sophisticated machine control technology has helped halve the schedule required for a road contract – Jeff Winke. By using the latest machine control systems on the equipment fleet, a US contractor has managed to halve worker hours, machine time and overall costs. “We chopped 50% off the contract schedule,” said Jim Swenson, licensed professional land surveyor for Oregon Mainline Paving based in McMinnville, Oregon. “The project was completed a year ahead of the two-year schedule,” he explained
  • China opens record-breaking bridge
    May 8, 2012
    China has opened the world's longest bridge over water, the 41.58km Jiaozhou Bay Bridge, which is said to have cost well over US$2 billion to build. It links the eastern port city of Qingdao to Huangdao Island across Jiaozhou Bay and is 4km longer than the previous longest bridge over water, the Lake Pontchartrain Causeway in Louisiana, USA. Opened in June, 2011 after four years of construction, the link is expected to carry some 30,000 vehicle/day and will reduce travel time by 30 minutes, although it is o
  • China opens record-breaking bridge
    February 22, 2012
    China has opened the world's longest bridge over water, the 41.58km Jiaozhou Bay Bridge, which is said to have cost well over US$2 billion to build. It links the eastern port city of Qingdao to Huangdao Island across Jiaozhou Bay and is 4km longer than the previous longest bridge over water, the Lake Pontchartrain Causeway in Louisiana, USA. Opened in June, 2011 after four years of construction, the link is expected to carry some 30,000 vehicle/day and will reduce travel time by 30 minutes, although it is o