Skip to main content

New Laos-Thailand bridge planned

Plans are moving forward for the new bridge structure connecting Thailand with neighbouring Laos. The Mekong Friendship Bridge will be 1.35km long and is expected to cost US$84.3 million to construct. The building work on the bridge will commence in 2019, with the necessary surveying work as well as the design now close to completion.
February 15, 2016 Read time: 1 min
Plans are moving forward for the new bridge structure connecting Thailand with neighbouring Laos. The Mekong Friendship Bridge will be 1.35km long and is expected to cost US$84.3 million to construct. The building work on the bridge will commence in 2019, with the necessary surveying work as well as the design now close to completion.

Related Content

  • Thailand’s widest river bridge on track
    May 26, 2022
    Thailand’s widest river bridge is on track for completion.
  • US$19.4 billion for Thailand’s transport development
    February 15, 2024
    A US$19.4 billion plan is being set for Thailand’s transport development programme.
  • New bridge and highway for Laos
    January 31, 2013
    Key infrastructure projects planned by the government in Laos will help improve the country’s transport connectivity. Heuangsy Construction is to rebuild a 132km road connecting Xanakham with Hinheup in a deal worth some US$168 million signed with the government. The project includes building a new border checkpoint at Vang as well as work to 19 bridges, and links to the Road No13 North and National Highway No11. Another key project being funded by the Laos Government is the $13.75 million bridge over the M
  • Border bridge being built between Thailand and Myanmar
    August 27, 2014
    A new border bridge is being built between Thailand and Myanmar. The second Friendship Bridge will connect Mae Sot in Thailand with Myawaddy in Myanmar, spanning the River Moei. The project is expected to cost some US$93.9 million. Construction will commence in early 2015 and the structure is expected to be completed by the end of 2015. The bridge will be designed with a weight capacity of 100tonnes.