Skip to main content

New Lagos bridge link being built

Construction work on a major urban bridge project will commence in Nigeria’s commercial centre Lagos during this year. A budget of US$2.66 billion has been set for building the Fourth Mainland Bridge, according to the Lagos State Government. The new bridge will be the longest of the bridges connecting Lagos Island to the mainland and will carry four lanes of traffic. Its construction is intended to cut congestion on the existing Eko, Carter and Third Mainland Bridges. Lagos suffers from amongst the heaviest
February 23, 2017 Read time: 2 mins
Construction work on a major urban bridge project will commence in Nigeria’s commercial centre Lagos during this year. A budget of US$2.66 billion has been set for building the Fourth Mainland Bridge, according to the Lagos State Government. The new bridge will be the longest of the bridges connecting Lagos Island to the mainland and will carry four lanes of traffic. Its construction is intended to cut congestion on the existing Eko, Carter and Third Mainland Bridges. Lagos suffers from amongst the heaviest traffic congestion of any city in the world and its ‘go slow’ that occurs at peak periods is notorious. The new route will run through Baiyeku, Langbasa and Lekki to Itamaga in Ikorodu and the project is being carried out under the build-operate-transfer model. The project will require the relocation of a number of homes in one of the city’s shanty town areas.

Related Content

  • Tunnelling project under Micang Mountain
    October 15, 2018
    Equipment from XCMG has played an important role in the excavation of a new tunnel link underneath the Micang Mountain in China. The project to build the right-hand bore for the Micang Mountain tunnel on the Sichuan-Shaanxi Expressway has taken 54 months to complete. The tunnel was needed as the Micang Mountain has been a barrier to direct transportation at the junction of Hanzhong and Bazhong. This has blocked the major transport route between Sichuan and Shaanxi, preventing traffic flows across the reg
  • Pre-stressed bridge decks use modular formwork system
    July 9, 2012
    Imaginative formwork, often using modular components, is helping to shape some challenging bridges worldwide. Patrick Smith reports Traffic volumes in and around Prague have swollen massively in recent years, pushing the existing road network to the limits of its capacity. To permanently ease congestion in the Czech capital's centre, a multi-lane orbital motorway is under construction as a high capacity bypass for central Prague and to link up all the motorways and other major highways radiating from the ci
  • Glasgow's new link opening
    February 28, 2012
    A new highway link is opening today in the Scottish city of Glasgow.
  • India’s capital highway project will improve transport connections
    October 10, 2017
    Huge numbers of construction machines as well as plant and equipment are working overtime, backed by mammoth manpower, to meet the targeted completion deadline of March 2018 for India’s Eastern Peripheral Expressway (EPE). The 135km arterial route is being built with six lanes and surrounds India’s National Capital, Delhi, its National Capital Region (NCR) and the industrially developed North Indian states of Haryana and Uttar Pradesh.