Skip to main content

New Krasondar bypass project approved

Official approval has been given for construction of a new Western bypass around Krasnodar in Russia. The PPP project is expected to cost US$515.4 million and the new link will provide a connection with the M4 Don federal highway. However it is also recognised that the cost of the tolled highway project could increase. The bypass will feature two lanes in either direction and will measure close to 53km long. Included in the project will be the construction of three interchanges, four bridges and 10 overpass
December 19, 2017 Read time: 1 min

Official approval has been given for construction of a new Western bypass around Krasnodar in Russia. The PPP project is expected to cost US$515.4 million and the new link will provide a connection with the M4 Don federal highway. However it is also recognised that the cost of the tolled highway project could increase. The bypass will feature two lanes in either direction and will measure close to 53km long. Included in the project will be the construction of three interchanges, four bridges and 10 overpasses.

Related Content

  • Chiloé island highway proposal
    March 17, 2025
    A new highway is proposed for Chile’s Chiloé island.
  • Possible delays for Gordie Howe Bridge
    November 15, 2022
    The tolled six-lane cable-stayed bridge over the Detroit River will connect the city of Windsor in the Canadian province of Ontario with Detroit in the neighbouring US state of Michigan.
  • Romania’s important bridge project
    October 5, 2022
    Romania’s important Braila Bridge project will deliver a key crossing spanning the Danube River
  • Malaysia actions Pan Borneo highway projects
    December 20, 2016
    Malaysia is pushing ahead with a series of construction projects that will form sections of the Pan Borneo Highway in Sarawak. Work will go ahead on eight sections of this important route and this will form phase one of the project, with the cost anticipated as some US$3.05 billion. The eight packages consist of the 95km stretch from Sematan to Sungai Moyan Bridge, an 89km stretch connecting Pantu Interchange with Batang Skrang and the 80km section from Sungai Tangap Interchange to the Pujut Link Road. They