Skip to main content

New Krasondar bypass project approved

Official approval has been given for construction of a new Western bypass around Krasnodar in Russia. The PPP project is expected to cost US$515.4 million and the new link will provide a connection with the M4 Don federal highway. However it is also recognised that the cost of the tolled highway project could increase. The bypass will feature two lanes in either direction and will measure close to 53km long. Included in the project will be the construction of three interchanges, four bridges and 10 overpass
December 19, 2017 Read time: 1 min

Official approval has been given for construction of a new Western bypass around Krasnodar in Russia. The PPP project is expected to cost US$515.4 million and the new link will provide a connection with the M4 Don federal highway. However it is also recognised that the cost of the tolled highway project could increase. The bypass will feature two lanes in either direction and will measure close to 53km long. Included in the project will be the construction of three interchanges, four bridges and 10 overpasses.

Related Content

  • India’s new expressway under construction
    July 19, 2022
    India’s longest new expressway is under construction.
  • Record attendance for Istanbul’s E&E conference
    June 14, 2012
    The Eurasphalt & Eurobitume 2012 event in Turkey has attracted record attendance figures, although final figures were not available at the time of writing.
  • Rebuilding a historic bridge linking the US and Canada
    March 8, 2016
    While many road authorities in North America are finding it difficult to stretch their bridge assets beyond half a century, one bridge is closing in on its centenary - David Arminas reports The international Peace Bridge, connecting the Canadian province of Ontario with the US state of New York, is 88 years young this year, and still going strong.
  • Construction materials and road design in East Africa
    June 25, 2013
    An envisaged shortage in the supply of angular rock or crushed stone in Tanzania and a determination to conserve the environment by Kenyan authorities dictated the engineering design of a multi-national road linking the two largest economies in Eastern Africa. Shem Oirere reports The cost of buying crushed stone or hiring a site for mining the material and the expenses of moving it from the crushing site to the project area, saw designers opt for an intermediate alignment and discarding of the inner and out