Skip to main content

New Hong Kong road tunnel planned

In Hong Kong plans are moving forward with regard to the construction of the new Lam Tin Tunnel. The tunnel will be around 2.6km long and form the major stretch of a new 4.2km road link connecting Lam Tin with Tseung Kwan O South. The Tseung Kwan O to Lam Tin Tunnel project also includes the construction of a number of interchanges, pedestrian walkways and cycle lanes. A key segment of the work is the construction of a 1.2km single one-lane slip road partly in the form of tunnel connecting Tseung Kwan O and
June 5, 2014 Read time: 2 mins
In Hong Kong plans are moving forward with regard to the construction of the new Lam Tin Tunnel. The tunnel will be around 2.6km long and form the major stretch of a new 4.2km road link connecting Lam Tin with Tseung Kwan O South. The Tseung Kwan O to Lam Tin Tunnel project also includes the construction of a number of interchanges, pedestrian walkways and cycle lanes. A key segment of the work is the construction of a 1.2km single one-lane slip road partly in the form of tunnel connecting Tseung Kwan O and Eastern Harbour Crossing. Another important aspect is the construction of the 400m long dual two-lane Cha Kwo Ling Tunnel between the proposed Lam Tin Interchange and Trunk Road T2. The P2 Road will be an 800m long, dual two-lane highway (Road P2), with some 600m of the link in a cutting and the remaining 200m covered by landscaped deck. The new Lam Tin Interchange and Tseung Kwan O Interchange will connect the new road and tunnel link to the existing road network. Ancillary works for the project include a number of footbridges, pedestrian crossings, cycle lanes, parking areas and modifications to the existing seawall. Neither the estimated cost of the work nor the work schedule, have so far been released.

Related Content

  • Importance of road/tunnel drainage systems
    April 10, 2012
    A variety of systems are available for quickly and efficiently removing water from roads as Patrick Smith reports The presence of water in a highway layer reduces the bearing capacity of the road, and in doing so it also reduces the structure's lifetime. Indeed, the recent extremely cold winter in many parts of Europe has shown that in colder climates there is a risk of frost damage when water is present resulting in costly potholes, so drainage systems performing properly are important in road design.
  • Importance of road/tunnel drainage systems
    May 8, 2012
    A variety of systems are available for quickly and efficiently removing water from roads as Patrick Smith reports. The presence of water in a highway layer reduces the bearing capacity of the road, and in doing so it also reduces the structure's lifetime. Indeed, the recent extremely cold winter in many parts of Europe has shown that in colder climates there is a risk of frost damage when water is present resulting in costly potholes, so drainage systems performing properly are important in road design.
  • Jerusalem bottleneck route to be upgraded
    March 1, 2012
    The upgrading of Highway 1 between Sha'ar Hagay and the entrance to Jerusalem, Israel, a 2.5 billion NIS project (US$733 million), is expected to take five years to complete.
  • Brazil’s Serra do Cafezal Highway
    July 29, 2015
    Brazil's improved Mercosur route will boost capacity and cut travel time - Mauro Nogarin writes. The Régis Bittencourt Highway is one of the main access routes of the Mercosur traffic. It has a length of 400km and connects the main cities of São Paulo and Curitiba, which allows for products to enter from the southeast toward the rest of the southern part of Brazil and later transit to Argentina, Paraguay and Uruguay. Products also flow into Brazil from Mercosur through this major highway. The cost of the hi