Skip to main content

New highway tender for Chile’s capital

The tender process is commencing for the Américo Vespucio Oriente expressway (AVO) in Chilean capital Santiago. The US$940 million tender is due to be awarded in February 2014. The 9km highway link will connect El Salto with Príncipe de Gales Avenue and will feature three lanes running in either direction, with a design speed of 80-100km/h. An underground section of this urban highway looks likely to be constructed using the New Austrian Tunnelling Method (NATM) while it may also include a section in an ope
July 26, 2013 Read time: 2 mins
The tender process is commencing for the Américo Vespucio Oriente expressway (AVO) in Chilean capital Santiago. The US$940 million tender is due to be awarded in February 2014. The 9km highway link will connect El Salto with Príncipe de Gales Avenue and will feature three lanes running in either direction, with a design speed of 80-100km/h. An underground section of this urban highway looks likely to be constructed using the New Austrian Tunnelling Method (NATM) while it may also include a section in an open trench and a stretch built using cut and cover techniques. The highway was originally intended to run for 13km between El Salto and the Rotonda Grecia. However the 968 Chilean Government decided to shorten the link by 4km in a bid to reduce costs as the original design would have cost in the region of $2 billion. The construction work will commence in 2016 and the highway is expected to open to traffic in 2020.

For more information on companies in this article

Related Content

  • Underground routes for highways
    July 20, 2012
    Increasingly, and where possible, roads are being built in tunnels often for environmental reasons, writes Patrick Smith As part of the new M7 motorway development in the southwest of Ireland, the four-lane route crosses the River Shannon near Limerick, before it flows into the Atlantic. Centrepiece of the 10km long Limerick Southern Ring Road is the required tunnelling (675m long), which including the north and south entrance and exit ramps, means it will be 915m long. Completion of the work is planned for
  • Construction underway for New Zealand highway link
    September 30, 2020
    Construction is well underway for an important New Zealand highway link.
  • Colombia highway concession package awarded
    November 8, 2019
    A major highway concession package has been awarded to a consortium in Colombia. Concesionaria Vial Andina (Coviandina) has won the tender to manage the 85.6km road connecting capital Bogota with Villavicencio. The package was awarded by the national infrastructure agency (ANI). Under the terms of the deal, the firm will maintain two sections of the existing road and build a new dual carriageway stretch with two lanes in either direction for the third section. The third stretch poses particular challenges t
  • New tunnel for Colombian capital
    February 3, 2014
    Pre -feasibility studies are commencing for a new tunnel project in Colombia capital Bogota. The tunnel is set to link Bogota’s north side with La Calera and the studies should be completed by April 2014. The project is expected to cost in the region of US$198.76 million to construct and will be for a 4.5km tolled tunnel. The project will be challenging however and will take up to four years to complete. The route will run from Street 170 in northern Bogota, linking the Perimetral Oriental ring road that is