Skip to main content

New highway project underway in Vietnam

In Vietnam work is now underway on a major new highway that will connect Ho Chi Minh city, Long An and Dong Nai. This 57km highway is currently the biggest road project in Vietnam’s southern region. The four-lane highway will have a speed limit of 100km/h and the project is costing some US$1.6 billion. The project is due for completion in 2018.
July 23, 2014 Read time: 1 min

In Vietnam work is now underway on a major new highway that will connect Ho Chi Minh city, Long An and Dong Nai. This 57km highway is currently the biggest road project in Vietnam’s southern region. The four-lane highway will have a speed limit of 100km/h and the project is costing some US$1.6 billion. The project is due for completion in 2018.

Related Content

  • Last link in Vietnam’s North-South Expressway
    May 3, 2024
    The Chi Lang-Huu Nghi section is the last part of the 2,060km-long expressway that connects the southern Mekong Delta with the northern province of Lang Son, bordering China.
  • Vietnam’s North-South highway plan
    October 19, 2016
    A new highway is being planned for Vietnam that will run from north-south and feature four traffic lanes, with two in either direction. The project has been put forward to the Vietnam Government by the country’s Ministry of Transport (MOT). The route of the highway has still to be revealed but the link would improve travel connections between capital Hanoi in the north of the country and Ho Chi Minh City in the south. Running for some 1,372km in all, the highway has an estimated cost of US$10.25 billion to
  • Vietnam bridge faces contractor challenge
    February 1, 2023
    A key Vietnamese project bridge faces a contractor challenge.
  • Two new Vietnam expressways
    February 15, 2017
    Work on two new expressways will commence in Vietnam during 2017. The projects are both being managed by the Vietnamese Government and are being constructed in the southern province of Dong Nai. A build-operate-transfer (BOT) format will be employed for the construction of a 60-kilometer-long first section A 60km expressway will run through Tan Phu and Dau Giay and join with the Dau Giay-Lien Khuong expressway, with the work being carried out under the build, operate, transfer model. This expressway