Skip to main content

New highway project in Rajasthan, India

Work is starting shortly on the construction of a new highway in India’s Rajasthan State. The highway project will be carried out by the contractor GHV (India) and the package of works was awarded by the National Highways Authority of India (NHAI). The work involves building a stretch of the NH-925A route that runs from Gagaria to Baori Kalan and on to Serwa-Bakhasar. This 197km section of NH-925A will form part of the highway from Sata to Gandhav, with the work costing close to US$175 million.
March 1, 2018 Read time: 1 min

Work is starting shortly on the construction of a new highway in India’s Rajasthan State. The highway project will be carried out by the contractor GHV (India) and the package of works was awarded by the 292 National Highways Authority of India (NHAI). The work involves building a stretch of the NH-925A route that runs from Gagaria to Baori Kalan and on to Serwa-Bakhasar. This 197km section of NH-925A will form part of the highway from Sata to Gandhav, with the work costing close to US$175 million.

For more information on companies in this article

Related Content

  • Work resumes on Indonesian tollway
    October 22, 2014
    Construction work on Indonesia’s Bekasi-Jakarta toll road has recommenced after a break of close to 20 years. The work on the 21km Bekasi-Jakarta toll road was originally started by Kresna Kusuma Dyandra Marga (KKDM), a consortium headed by state-run Waskita Karya, with a 60% share in the package. However work on the project was stopped in the late 1990s due to the Asian financial crisis. The deal for the link will see KKDM operating the toll road, which is costing US$600 million. State funds worth some $2
  • New Zealand highway project going ahead
    December 2, 2016
    Work is now going ahead on the new highway stretch to connect Peka Peka with Otaki, which will form part of the planned Kapiti Expressway. This 13km stretch of highway is being built by contractor Fletcher Construction. The package of works was awarded by the New Zealand Transport Agency (NZTA) and involves designing and building the new link. Construction work will start in 2017 and is expected to take until 2020.
  • Zimbabwe highway project faces delay
    July 12, 2018
    The project to build Zimbabwe’s crucial north-south highway link is facing delays, with the contract now having to be re-awarded. The tender was originally awarded to an Austrian firm, Geiger International, but with progress having proven very slow this has been withdrawn. The deal has not yet been re-awarded. But the Zimbabwe Government is at present in discussions with the second bidder from the original tender process, Anhui Foreign Economic Construction Group Limited (AFECC), over the contract. The hig
  • Spanish firm handling Indian road projects
    January 26, 2015
    Work on four new road projects in India will be carried out by Spanish contractor Isolux Corsan. In all the work is worth US$306.5 million. The 130km stretch of road connecting Talcher with Chandikole in Odisha is costing $124.9 million to construct. One stretch is for a 160km road between Phalodi and Jaisalmer in Rajasthan. The other two sections of road being built are in Assam.