Skip to main content

New highway in Pakistan being built

Work is now underway in Pakistan on the new Gwadar-Turbat-Hoshab highway. This 193km highway is expected to cost close to US$124 million to construct. The Gwadar-Turbat-Hoshab Road (M-8) in Pakistan will connect Gwadar Port with Quetta by connecting the port with the eastern, central and western routes of the China-Pakistan Economic Corridor (CPEC).
February 9, 2016 Read time: 1 min
Work is now underway in Pakistan on the new Gwadar-Turbat-Hoshab highway. This 193km highway is expected to cost close to US$124 million to construct. The Gwadar-Turbat-Hoshab Road (M-8) in Pakistan will connect Gwadar Port with Quetta by connecting the port with the eastern, central and western routes of the China-Pakistan Economic Corridor (CPEC).

Related Content

  • Major Brazilian bridge project revised
    December 9, 2020
    A major Brazilian bridge project has been revised.
  • A new Malaysia-Indonesia link
    September 29, 2022
    A new Malaysia-Indonesia road link is being planned.
  • New highway and bridge projects for New Zealand
    June 30, 2014
    A series of new road and bridge projects worth some US$186 million will help connectivity in New Zealand. The plans include studies for three projects in Bays of Plenty, Hawkes Bany and Nelson. Other planned projects include the Nelson southern link, Rotorua eastern arterial and a Port of Napier access package. The programme includes work on the construction of five road projects as well as building a number of bridges. This programme of works is in addition to plans for work on regional roads.
  • Construction of key China highway link
    July 23, 2018
    Construction work is now commencing for a key stretch of highway in China, with the work costing some US$3.47 billion. The 73km highway will connect Langfang City and Baoding City, which lie to the south of Beijing. This new highway section will also connect the Beijing-Taipei Highway with the Beijing-Hong Kong-Macau Highway. The work is being carried out under the PPP model. The route will feature four lanes in either direction and will allow maximum travel speeds of 120km/h.