Skip to main content

New highway linking Serbia with Albania through Kosovo planned

Plans are now being worked on for a new highway that will connect Serbia with Albania, running through Kosovo. The project is momentous and marks a considerable diplomatic advance, given that Serbia’s past relations with its neighbour Kosovo and Albania have been less than harmonious in the recent past. This new move is seeing a Technical Working Group comprised of experts from Albania and Serbia looking into the construction of a new highway link between the two countries, as well as new railway connection
February 25, 2015 Read time: 1 min
Plans are now being worked on for a new highway that will connect Serbia with Albania, running through Kosovo. The project is momentous and marks a considerable diplomatic advance, given that Serbia’s past relations with its neighbour Kosovo and Albania have been less than harmonious in the recent past. This new move is seeing a Technical Working Group comprised of experts from Albania and Serbia looking into the construction of a new highway link between the two countries, as well as new railway connections. This group will present two projects to the 2465 European Commission in May 2015. The talks between the two countries will focus on construction of the Nis-Pristina-Tirana highway, and reconstruction and an upgrade of the Belgrade-Bar railway line. The total cost of the two projects is estimated at around €2 billion.

The highway connection between Kosovan capital Pristina and the Albanian border was constructed by joint venture partners 4138 Bechtel 5252 Enka. This new highway connection will run from Pristina to the Kosovo/Serbian border, completing the link from Serbia to Albania’s capital Tirana.

For more information, %$Linker: 2 Internal <?xml version="1.0" encoding="utf-16"?><dictionary /> 2 2425 0 oLinkInternal visit this page Kosovo's award-winning green highway construction false /sections/key-projects/features/kosovos-award-winning-green-highway-construction/ false false%>.

For more information on companies in this article

Related Content

  • CTE develops new high reach access platform
    February 15, 2013
    A new platform line has been launched by CTE, the B-Lift 390 High Range, a truck-mounted high range telescopic platform which is able to meet the requirements of various markets. The platform reaches 39 m of working height with 26.3m of maximum outreach and 450kg of maximum loading capacity. It has a telescopic boom (4 elements) with main boom and 3 telescopic extensions and H stabilisation system.
  • Haver & Boecker is adding to its screen range with wire and polyurethane screen decks
    February 8, 2013
    Haver & Boecker is expanding its screen range with the addition of the Ty-Wire hybrid screen deck and of ultrasound screen decks. Ty-Wire hybrid screens use wire that is covered in polyurethane, providing a greater open area than a standard PU screen but with a lifetime that can be 4-6 times longer.
  • ContiTech’s new technology for fabric conveyor belts reduces weight and spares resources
    April 18, 2013
    The ContiTech Conveyor Belt Group claims it has taken a major step towards sustainable technology with the launch of the Conti lightweight, which can reduce the weight of fabric conveyor belts by up to 30%. “The lower weight significantly reduces the amount of drive energy needed,” explained Frank Kantorek, from the company’s business development section. “This means Conti lightweight technology makes a major contribution to the conservation of resources and protection of the environment,” he added.
  • MOBA’s innovative drill control offers efficiency
    February 8, 2013
    MOBA continues to develop its novel MDS-2000 drilling system. This package has already proven itself in use for blast hole drilling in many operations and can now be used to record the orientation of the machine with GNSS antennae and the height using laser reference. With telesupport, MOBA also offers fast service through an Internet connection. By recording the machine orientation using two GNSS antennae, the torsion on the machine can be determined with very high accuracy and included in the calculation