Skip to main content

New Forth Road Bridge

Halcrow has been appointed by Transport Scotland to develop a bridge operating company contract to manage and maintain the new Forth Replacement Crossing and the existing Forth Road Bridge. The £1.6million commission, won in the face of stiff competition under Transport Scotland’s multiple framework agreement, runs to December 2014. “Halcrow’s proven expertise as a client advisor helped us to deliver a winning proposition that targeted our client’s needs,” said Donald Bell, Halcrow’s client manager. “Our ro
June 25, 2012 Read time: 2 mins
A new Forth Road Bridge will be constructed alongside the existing structure
2320 Halcrow has been appointed by 4068 Transport Scotland to develop a bridge operating company contract to manage and maintain the new Forth Replacement Crossing and the existing Forth Road Bridge.

The £1.6million commission, won in the face of stiff competition under Transport Scotland’s multiple framework agreement, runs to December 2014. “Halcrow’s proven expertise as a client advisor helped us to deliver a winning proposition that targeted our client’s needs,” said Donald Bell, Halcrow’s client manager. “Our role will include development of the contrA new Forth Road Bridge will be constructed alongside the existing structure
act requirements and specification, supporting the parliamentary bill to dissolve the existing statutory arrangements and the procurement award and mobilisation of the bridge operating company.”  

The project is said to build on Halcrow’s existing expertise in contract preparation and procurement for Transport Scotland under the company’s performance audit group (PAG) commission. Specialist long-span bridge sub-consultants Flint & Neill will provide technical support to the Halcrow team. The Halcrow team will be co-located on site with Transport Scotland and the 4069 Forth Estuary Transport Authority, the operators of the existing bridge.

For more information on companies in this article

Related Content

  • Drainage for new Wear Crossing in UK
    January 21, 2016
    In the UK the Lanes Group is carrying out the contract to build specialist drainage for the New Wear Bridge in Sunderland. The Lanes Group will carry out this work for the joint venture partners building the new bridge link.
  • Superlative formwork’s global appeal
    April 25, 2013
    The latest formwork solutions are enabling some tough bridge-building projects to be delivered in South America and Europe, while the world’s largest construction equipment show is seeing the merits of other cutting-edge formwork. Guy Woodford reports. Taking a road and rail link across one of South America’s largest rivers, together with its swamps and floodplain, calls for a new crossing of superlative dimensions. Two 135.5m pylons for the third bridge across the Orinoco River in Venezuela are taking shap
  • ERF sets out plans for 2014 symposium
    May 19, 2014
    The road infrastructure sector, in its strive to deliver better products for its customers, such as road authorities, has worked hard to develop innovative solutions. These are intended to be more durable, making them more cost-effective in the long-run, and also more environmentally friendly. In its efforts, however, it has often been frustrated by a rigid legal framework that leaves little room for manoeuvre to its customers. Until last year, existing rules for public procurement at EU level gave almost u
  • A vision of roads
    September 3, 2012
    By 2040 European roads could be built differently, and hopefully be safer, according to the EU research programme NR2C