Skip to main content

New Forth Road Bridge

Halcrow has been appointed by Transport Scotland to develop a bridge operating company contract to manage and maintain the new Forth Replacement Crossing and the existing Forth Road Bridge. The £1.6million commission, won in the face of stiff competition under Transport Scotland’s multiple framework agreement, runs to December 2014. “Halcrow’s proven expertise as a client advisor helped us to deliver a winning proposition that targeted our client’s needs,” said Donald Bell, Halcrow’s client manager. “Our ro
June 25, 2012 Read time: 2 mins
A new Forth Road Bridge will be constructed alongside the existing structure
2320 Halcrow has been appointed by 4068 Transport Scotland to develop a bridge operating company contract to manage and maintain the new Forth Replacement Crossing and the existing Forth Road Bridge.

The £1.6million commission, won in the face of stiff competition under Transport Scotland’s multiple framework agreement, runs to December 2014. “Halcrow’s proven expertise as a client advisor helped us to deliver a winning proposition that targeted our client’s needs,” said Donald Bell, Halcrow’s client manager. “Our role will include development of the contrA new Forth Road Bridge will be constructed alongside the existing structure
act requirements and specification, supporting the parliamentary bill to dissolve the existing statutory arrangements and the procurement award and mobilisation of the bridge operating company.”  

The project is said to build on Halcrow’s existing expertise in contract preparation and procurement for Transport Scotland under the company’s performance audit group (PAG) commission. Specialist long-span bridge sub-consultants Flint & Neill will provide technical support to the Halcrow team. The Halcrow team will be co-located on site with Transport Scotland and the 4069 Forth Estuary Transport Authority, the operators of the existing bridge.

For more information on companies in this article

Related Content

  • Bridge design using flow modelling techniques
    February 17, 2012
    SBG has set numerous engineering precedents with its hugely innovative Jamarat Bridge project in Saudi Arabia
  • Vital structures
    February 10, 2012
    A wide variety of products are available to help bridge owners reduce the need for costly repairs. Bridges are one of the most expensive structures on a highway system, and their maintenance, and where necessary, repair will save millions over time. Prevention being better than cure means that anything that can be done to reduce the need for repair is a good investment. For example, a MOOG bucket-type inspection unit has been commissioned for the Naini Bridge in Allahabad in the state of Uttar Pradesh, Indi
  • Tunnels - an environmentally attractive option?
    February 21, 2012
    While tunnels are often more expensive than bridges, they can offer environmentally attractive options for transport schemes. Tunnels offer environmentally attractive options for a range of transport infrastructure schemes, but in many cases high construction costs may restrict their use.
  • Mott MacDonald secure prized European Commission contract
    April 1, 2014
    Mott MacDonald has been awarded a €4 million, two-year contract to provide technical assistance to the European Commission's (EC) Directorate-General for Enlargement. The consultancy will support the coordination of socio-economic development interventions initiated and implemented by the EC, international financing institutions and bilateral donors in Western Balkans beneficiary countries as part of their Western Balkans Investment Framework (WBIF) initiative.