Skip to main content

New Forth Road Bridge

Halcrow has been appointed by Transport Scotland to develop a bridge operating company contract to manage and maintain the new Forth Replacement Crossing and the existing Forth Road Bridge. The £1.6million commission, won in the face of stiff competition under Transport Scotland’s multiple framework agreement, runs to December 2014. “Halcrow’s proven expertise as a client advisor helped us to deliver a winning proposition that targeted our client’s needs,” said Donald Bell, Halcrow’s client manager. “Our ro
June 25, 2012 Read time: 2 mins
A new Forth Road Bridge will be constructed alongside the existing structure
2320 Halcrow has been appointed by 4068 Transport Scotland to develop a bridge operating company contract to manage and maintain the new Forth Replacement Crossing and the existing Forth Road Bridge.

The £1.6million commission, won in the face of stiff competition under Transport Scotland’s multiple framework agreement, runs to December 2014. “Halcrow’s proven expertise as a client advisor helped us to deliver a winning proposition that targeted our client’s needs,” said Donald Bell, Halcrow’s client manager. “Our role will include development of the contrA new Forth Road Bridge will be constructed alongside the existing structure
act requirements and specification, supporting the parliamentary bill to dissolve the existing statutory arrangements and the procurement award and mobilisation of the bridge operating company.”  

The project is said to build on Halcrow’s existing expertise in contract preparation and procurement for Transport Scotland under the company’s performance audit group (PAG) commission. Specialist long-span bridge sub-consultants Flint & Neill will provide technical support to the Halcrow team. The Halcrow team will be co-located on site with Transport Scotland and the 4069 Forth Estuary Transport Authority, the operators of the existing bridge.

For more information on companies in this article

Related Content

  • Formwork innovations help bridge building
    July 7, 2015
    A series of formwork developments are helping with challenging bridge construction projects around the world - Mike Woof writes In the Polish city of Krakow, a cost-effective cable stayed bridge is being constructed using a balanced cantilever technique. The current expansion of the Krakow metropolitan railway network (KST) requires the building of a crossing of the Krakow-Plaszow railway junction. Ensuring that daily rail operations remained unaffected during the construction of the 252m long crossing w
  • Extended Traffic Control in 2014 and beyond
    April 3, 2014
    One leading traffic control solution company has announced a major acquisition to broaden its customer offer, while the delivery of an ambitious real-time journey information service for Scotland’s motorists is well on track. Guy Woodford reports Kapsch’s TrafficCom says its high-profile recent US$16 million acquisition of Transdyn will enable it to offer current and future customers worldwide an extended end-to-end product and solution portfolio for intelligent transport systems (ITS). The acquisitio
  • Manitowoc MLC650 cranes keep Champlain Bridge on track
    October 28, 2016
    Two Manitowoc MLC650s are working on a project to replace the Champlain Bridge that spans the Saint Lawrence River in Montreal, Canada. The engineering consortium - Signature on the Saint Lawrence Construction (SSLC) – is assigned to the task. The capacity and reduced ground preparation made possible by the MLC650’s VPC-MAX attachment – as well as the ease of use of its Crane Control System (CCS) – are helping the team stay on schedule. The Champlain Bridge connects one of North America’s busiest road
  • Europe's roads need innovation and research
    February 28, 2012
    FEHRL's fifth SERRP is set to drive road transport into the 21st century